|
Lot 1 - Transverse Corrugation In Asphalt Mass - Speed Bump Type A - Conservation Of Urban Roads Without Resurfacing, Lot 1 - Transverse Corrugation In Asphalt Mass - Speed Hump Type B - Conservation Of Urban Roads Without Resurfacing, Lot 1 - Raised Lane For Pedestrian Crossings In Asphalt Mass - Lombafaixa - Conservation Of Roads Without Carrying Out Resurfacing, Lot 1 - Discontinuous Milling Of Asphalt Coating - Thickness Of 7 Cm, Lot 1 - Ina.01 - Binder Bituminous Primer, 03/03/2026 - 15:28:20, Lot 1 - Execution Of Pavement With Application Of Asphalt Concrete, Layer Of Bearing - Exclusiveload And Transport. Af_11/2019, Lot 1 - Loading Asphalt Mixture In 10 M Dump Truck, Lot 1 - Transport With 10 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Additional For Dmt Exceeding 30 Km (Unit: M3xkm). Af_07/2020, Lot 1 - Transport Of Rubble By Dump Truck, Starting At 1Km, Lot 1 - Standard Model Chemical Toilet, With Maintenance In Accordance With Cetesb Requirements, Lot 1 - Lease Of Deposit Type Container - Minimum Area Of 13, 80 M², Lot 1 - Demolition Of Asphalt Layer, Includes Loading Truck, Lot 1 - Discontinuous Milling Of Asphalt Coating - Thickness Of 5 Cm, Lot 1 - Milling Of Asphalt Pavement With A Thickness Of Up To 5 Cm, Including Removal Of Milled Material Up To 10 Kilometers And Sweeping, Lot 1 - Demolition Of Asphalt Pavement, Including Cover, Lot 1 - Box Opening Up To 25Cm, Includes Excavation, Compaction, Transport And Preparation Of The Sub-Bed, Lot 1 - Graded Crushed Base Treated With Cement - Bgtc, Lot 1 - Graded Crushed Base, Lot 1 - Rachão Foundation, Lot 1 - Ina.01 - Bituminous Binder Primer, Lot 1 - Bituminous Waterproofing Primer, Binder Layer - Exclusive Cargo And Transport. Af_11/2019, Bearing Layer - Exclusive Cargo And Transport. Af_11/2019, Lot 1 - Load Of Asphalt Mixture In Dump Truck 10 M³ (Unit: M3). Af_07/2020, Dmt Up To 30 Km (Unit: M3xkm). Af_07/2020, Lot 1 - Transport With A 10 M³ Dump Truck, On A Paved Urban Road, Additional For 30 Km (Unit: M3xkm). Af_07/2020, Lot 1 - Mechanical Excavation, Loading And Removal Of Earth Up To An Average Distance Of 1.0Km, With A 10M3 Dump Truck, Lot 1 - Removal Of Earth Beyond The First Km With A 14 M3 Truck, Lot 1 - Transport Of Debris By Dump Truck, Lot 1 - Leveling Of Pit Visit, Lot 1 - Inc.27 - Supply And Installation Of Guides Type Pmsp100, Including Deterra Slope - Fck=25, 0Mpa, Lot 1 - Inc.27 - Construction Of Gutter Or Concrete Jetting - Fck=25, Lot 1 - Demolition Of Deconcrete Pavement, Gutter Or Gutter, Includes Loading On Truck, Lot 1 - Removal Of Guides, Lot 1 - Resettlement Of Cobblestones, Grouting With Stone Dust, With Reuse Of Cobblestones - Including Removal And Placement Of Material. Af_12/2020, Lot 1 - Pulling Out Cobblestones, Lot 1 - Transporting Cobblestones, Lot 1 - Hot Crack Sealing With Crack Saddle Equipment Attached To The Truck Wooden Body, Lot 1 - Cold Microcoating With 2.0 Cm Polymer Modified Emulsion - Range Iii - Commercial Brita
|