|
Mobilization And Demobilization Of Work - For Works Executed In Urban Centers Or Near An Urban Center, Works With A Value Above R$3,000,000. Sanitary Landfill (D6 Crawler Tractor, Hydraulic Crawler Excavator, Dump Truck And Water Truck) Labor And Equipment Intended For The Operation Of The Sanitary Landfill (D6 Crawler Tractor, Dump Truck And Water Truck), Rockfill With Hand Stone (Vertical Drains/ Fishbone) Rockfill With Stone With Tidy Hand (Vertical Drains/ Herringbone), Pre-Welded Screen Q-138- Supply And Positioning (Vertical Drains)Pre-Welded Screen Q-138- Supply And Positioning (Vertical Drains), Supply And Installation Of Non-Woven Geotextile Blanket In Polyester, Needled (Vertical Drain/ Herringbone Peixe)Supply And Installation Of Non-Woven Polyester Geotextile Blanket, Agulhado (Vertical Drain/Fishbone), 03/03/2026 - 16:14:06, Excavation Of 1St Category Material (Fishbone Drain)Excavation Of 1St Category Material (Fishbone Drain), Execution Of Reno Mattress (Surface Drainage)Execution Of Reno Mattress (Surface Drainage), Execution Of A Box Type Gabion (Anchoring The Reno Mattress)Execution Of A Box Type Gabion (Anchoring The Reno Mattress), Half Cane Concrete Channel - 30Cm Half Cane Concrete Channel - 30Cm, Burner Relocation - Disassembly And Burner Relocation Assembly - Disassembly And Assembly, Supply Of Topographical Landmarksupply Of Topographical Landmarks, Grass On Plates - Supply And Planting, Including Topsoil Grass On Slabs - Supply And Planting, Including Topographical Land, Supply, Transport And Application Of Running Spout - General Usesupply, Transport And Application Of Running Spout - General Use, Collection And Treatment Of Liquid Leachatecollection And Treatment Of Leachate Liquid, Loading, Transport And Unloading Of 1St Category Materialloading, Transport And Unloading Of 1St Category Material, Usinadol Fck 20 Mpa Drain Base - Usinadol Fck 20 Mpa Gas Concrete Drain Base - Gas Drain Base Execution, Thermoplastic Blanket, Hdpe, Smooth Geomembrane, E = 2.0 Mm, Nbr 15352 - Supply And Installation Of Thermoplastic Blanket, Nbr 15352 - Supply And Installation, Supply And Laying Of 20Mm Perforated Corrugated Hdpe Tubesupply And Laying Of 20Mm Perforated Corrugated Hdpe Tube, Accompany, Then Geotechnical Topography Technicianaccompany, Then Geotechnical Topography Technician, Predictive And Corrective Maintenance Of The Scale Measurement And Controlpredictive And Corrective Maintenance Of The Scale Measurement And Control, Environmental Monitoring Of Surface And Groundwater Environmental Monitoring Of Surface And Groundwater, Air Quality Monitoringair Quality Monitoring, Noise Monitoringnoise Monitoring, Gas Monitoringgas Monitoring, Operation Of The Sorting And Composting Plantoperation Of The Sorting And Composting Plant, Surface Cleaning, Including Destocking, Transportation, Unloading And Spreading Of Material In The Deposit Area; Smoothing Conventional Concrete Fck 10 Mpa - Slim
|