Sterilization, Disinfection And Hygiene Devices – Delivery And Assembly Of Rdges And Drying Cabinets. Planning Services, Construction Services, Delivery, Assembly And Validation Of Cleaning And Disinfection Devices, Drying Cabinets, Necessary Accessories Such As Rfid Scanners And Corresponding Software Licenses For Uniform Documentation In The Existing System. As Part Of The Device Replacement, The Previously Used Room Will Be Technically Upgraded And Adapted To Current Hygienic Requirements. For This Reason, Pass-Through Machines Should Be Offered Which, Covered With Stainless Steel At Ceiling Height, Also Serve As A Spatial Separation Between Clean And Unclean Work Areas. The New Rdges Must Be Able To Hold At Least 12 Endoscopes. Peracetic Acid Is Used As The Process Chemistry. In The Interests Of User Safety And Due To The Lack Of An Activated Carbon Filter In The Room Air System, Encapsulated Canisters Must Be Used To Prevent Inhalation Contact With The Chemicals. Due To The Space Available And Limited Movement Areas, The Doors Of The Devices Should Be Designed As Lifting Doors. The Reprocessing Of Existing Endoscopes Must Be Permitted And Possible In The New Devices; A List Of The Devices Can Be Found In The Appendix. This Also Applies To The Preparation Of Balloon And Albarran Canals. For Hanging Storage And Drying Of The Endoscopes, Drying Cabinets With At Least 16 Storage Spaces Should Be Provided, Which Should Also Be Installed At Ceiling Height. Appropriate Holders For The Different Types Must Be Provided In Sufficient Quantities. The Entire Process From Preparation And Possible Drying In The Rdge To Drying In The Drying Oven Must Be Validated. The Documentation Of The Processing Must Be Completely Digital. Currently, Rfid Transponders And The Hytrack Software From Olympus Are Used For This Purpose. Due To The Planned Spatial Division, An Additional Standing Workstation Is Provided For Documentation. The License Extension For This Must Be Taken Into Account. The Corresponding Hardware (Pc + Holder) Is Procured By The Company. If The Solutions Offered Are Not Compatible With The Existing Software Or The Existing Rfid Transponders, A Concept Paper (Maximum 5 Pages) Must Explain How The Connection Will Be Implemented, As Well As The Costs Of The Software Solution Including The Required Interface To The Viewpoint And All Hardware Required For Implementation. In Order To Ensure The Conversion During Ongoing Operations, The Existing Devices (3X Etd3 And 2Xetd4) Must First Be Gradually Moved Into The Adjoining Rooms And Validated. A Pmp-Certified Project Manager Must Be Provided For The Entire Project Phase. Appropriate Project Management Is Expected From Preparation And Installation To Actual Acceptance. Due To Structural Requirements In The Existing Building, The Media Connections Must Be Made From The Ceiling. The Aemp Is Located On The Level Below So That No Penetrations Can Be Made Through The Floor. The Devices Must Therefore Be In One
Contact Information
Address
Thiemstraße 111
Contact No.
+49 35546-2384
Email
Vergabe@mul-ct.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109850898
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.