Civil Engineering Consultancy Services – Go4gewerbe, Mönchengladbach Trotting Track - Dismantling And Preparation. With This Award Procedure, The Planning Services For The Dismantling Of The Existing Buildings And The Preparation Of The Area Are To Be Awarded To A Planning Office. The Subject Of The Award Procedure Are The Following Service Parts A-F, Whereby Service Parts A-D Are Assigned To The Area Preparation And Service Parts E-F Are Dedicated To Building Dismantling: - Service Part A: Subsoil, Hydrogeology And Contaminated Sites - Service Part B: Technical Investigation (Soil) - Service Part C: Planning Earthworks - Service Part D: Expert For Preparation And Development - Service Part E: Planning Building Dismantling - Service Part F: Expert For Building Dismantling - Service Part G: Services On An Hourly Basis The Planning Services For Preparation And Demolition Of The Building Are Closely Interlinked Locally And Require Temporal And Technical Coordination In The Construction Process, Both Within The Framework Of The Planning And Later In The Structural Implementation. The Alphabetical Order Is Not A Chronological List Or A Temporal Provision Of Services, But Is Broken Down According To Service Profiles Based On The Geotechnics Services According To Appendix 1 (To §3 Paragraph 1) Of The Hoai, The Services In The Planning Area Of Construction Site Clearance / Dismantling In Accordance With Aho No. 18 And The Services In The Planning Area Of Construction Site Clearance / Contaminated Sites In Accordance With Aho No. 8. Implementation Period The Contractors Work Begins Immediately After Order Placement Planned. The Service Period Is Divided Into Four Stages: Stage 1: Basic Determination And Preliminary Planning Processing Of Service Phases 1 To 2 For The Object Planning Of Traffic Systems, Engineering Structures And Open Spaces Must Begin Immediately After The Order Has Been Placed. This Is Expected To Be Completed By June 15, 2026. For The Funding Application, Lp 2 Including Cost Estimates Must Be Submitted By June 30, 2026. This Corresponds To The Following Items In The Service Description Or The Service List: - Service Part A: Subsoil, Hydrogeology And Contaminated Sites -> Service Items A.1. To A.5. -> No Final Report Required, But Presentation With All Relevant Results And Recommendations By June 15, 2026) - Service Part B: Technical Investigation (Soil) -> Service Items B.1. And B.2 -> All Service Packages For Field Work, Earthworks Laboratory And Chemical Analysis - Service Part C: Planning Earthworks -> Service Item C.1. (Basic Determination And Preliminary Planning) - Service Part E: Planning Building Dismantling -> Service Item E.1. (Basic Determination And Preliminary Planning) - Service Part F: Technical Investigation (Building) -> Service Items F.1 And F.2 -> All Service Packages For Sampling Chemical Analysis Optional - Stage 2: Design Planning And Approval Planning The Design And Approval Planning Must Be Completed By The End Of 2026. - Service Part A: Subsoil, Hydrogeology And Contaminated Sites -> Submission Of Final Report - Service Part C: Planning Earthworks -
Contact Information
Address
Hansaallee 299
Contact No.
+49 23143410
Email
zentralevergabe@nrw-urban.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109850865
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.