Airfield Pavement Construction Work – Renovation Of The Concrete Surface Of The T2b Service Road. The Task Of The Winning Tenderer Is To Fully Implement The Construction Tasks Of The Renovation Of The Concrete Surface Of The Road Leading Directly To The Aircraft Service Area (T2b Service Road). Place Of Execution: Budapest Airport Budapest Liszt Ferenc International Airport The Service Road Forms Part Of The Concrete Pavement Of The Surface In Front Of The Concourse Of The T2b Terminal. This Section Of The Service Road Has Very High Traffic And There Is A Lot Of Cross Traffic Due To The Machine Services, Ground Handling Unit Parking Lots And Gse Areas. The Construction Task Must Be Carried Out For The Purpose Of Increasing Capacity, Renovation, Increasing The Technical Condition And Safety Of Air Traffic, Due To Increased Traffic Growth, And To Ensure Compliance With Regulation 139/2014/Eu. The Construction Of The New Basalt Reinforced Concrete Cover Took Approx. The Bidder Plans To Have It Carried Out On An Area Of 5,400 M2. The Protection Of The Affected Utilities (It, Electricity, Water Utility), Elements During Construction And The Protection Of The Design Of The Drain Leakage System Are Related To The Task. The Renovation Works Of The T2b Service Road Take Place In The Area Of The T2 Apron, Where The Requirements Of The Budapest Airport Airside Construction Manual Are The Standard. The Construction Area Is Partly Next To The Code C Taxiway And In The Immediate Vicinity Of The Code C Stands, In Their Safety Lane, Where, In Addition To Those Mentioned Above, The Current Easa Regulations Also Apply. The Construction Work Must Be Carried Out Taking Into Account The International - Such As, But Not Limited To, The Easa - And Domestic Aviation Authority Regulations, Standards And Directives, And Observing The Provisions Laid Down Therein. During The Construction Work, All Materials Suitable For Recycling From The Demolition Of Road Structures Or Other Structures Must Be 100% Recycled, Or They Must Be Transported By The Shortest Possible Route To The Designated Landfill And Prepared There For Later Recycling. The Contractor Must Eliminate The Waste Status Of The Crushed And Crushed Concrete, And The Crushed And Crushed Concrete Must Be Reclassified Before Installation. In The Area Of The Bud, Waste From The Construction, Which Is Not Designated For Recycling By The Customer, Must Be Transported In A Documented And Selective Manner Based On The Applicable Legislation. Only Non-Recyclable Or Hazardous Waste Can Be Placed In A Landfill. In Detail, According To The Technical Description And Unpriced Budget That Are Part Of The Public Procurement Documents.
Contact Information
Contact No.
+36 707041603
Email
istvan.kocsis@bud.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109850655
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.