Heating, Ventilation And Air-Conditioning Installation Work – Hls Work On Modular Buildings. Sanitary Technology: 2 Washbasin/Hand Basin System 4 M Dirty Water Pipe Up To Dn 100 Made Of Ht Pipe 20 M Dirty Water Pipe Up To Dn 100 Made Of Pp Incl. Thermal Insulation And Pvc Jacket 3 Pieces Of Drinking Water Fittings Up To Dn 32 Incl. Insulation Cap 85 M Drinking Water Pipe Made Of Stainless Steel Up To Dn 20 Incl. Thermal Insulation 51 M Heating Tape For Dirty Water & Drinking Water Pipe Heating Technology: 1 Pcs. Air/Water Split Block Heat Pump 1 Pcs. Buffer Storage Tank 210 Liters 301 M C Steel Pipe Thermal Insulation 1 Pcs. Filling The Heating System 17 Pcs. Valve Radiators Incl. Fastening 6 Pcs. Valve Radiator Connection Screws 2 Pcs. Single Clamp Rosettes 16 Pcs. Double Rosettes 12 Pcs Pcs. Built-In Device With Heat Recovery 4 Pcs. Spacer Frame 4 Pcs. Control Element 4 Pcs. Carbon Dioxide Sensor
Contact Information
Address
Am Kreishaus 1-5
Contact No.
+49 6192201-0
Email
vergabe_projekte@mtk.org
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109850217
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.