Demolition Work – Development. 1: Sewer Construction / Dirty Water, Rainwater Canal, Landscaping Work Approx. 2,150 M3 Pipe Trench Excavation Approx. 130 M Dn 250 Pieces Pipe Approx. 50 M Dn150 Pp Pipe Approx. 325 M Dn300 Stb Pipe Approx. 22 Pcs. Control Shafts2: Rain Retention Basin Approx. 570 M3 Excavation3: Fire Water Tank/Cistern Approx. 700 M3 Excavation Approx. 2 Plastic Containers (Grid Box) Approx. 1 Fire Water Extraction Shaft4: Water Pipe Approx. 390 M3 Pipe Trench Excavation Approx. 11 M Dn100 Hd-Pe Pipes Approx. 178 M Dn150 Hd-Pe Pipes Approx. 1 Piece Overground Hydrant5: Road Construction: Approx. Dissolve 680 M3 Of Soil Approx. 90 M3 Frost Protection Gravel Approx. 225 M2 Gravel Base Layer Approx. 225 M2 Asphalt Base Layer Approx. 225 M2 Asphalt Surface Layer Fb
Contact Information
Address
Residenzplatz 14
Contact No.
084199321516
Email
kidm@hitzler-ingenieure.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109850146
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.