Load-Bearing Structure Design Services – Tragwerksplanung. The Steglitz-Zehlendorf District Office, Sefm, Hochbauservice Is Planning To Demolish And Build A New Changing Building On The Ernst-Reuter-Sportfeld, Onkel-Tom-Str. 40, 14169 Berlin. The Construction Site Is Located At The Northwest End Of The Sports Field And Borders The Zinnowwald School. The Single-Storey, Polluted Existing Building Will Be Dismantled And A Two-Storey New Building Of Building Class 3 With A Gross Floor Area Of Approx. 800M² Will Be Built Using Sustainable Construction Methods (Modular Construction, Use Of Predominantly Sustainable Building Materials). It Is Possible To Design The Flat Roof As A Green Roof. Depending On The Energy Producer, The New Building May Have To Exceed The Minimum Requirements Of The Geg For The Thermal Building Envelope. The Tga Planner Should Examine The Variants As Follows: Hot Water Preparation (Drinking Water And Heating Requirements) Should Preferably Be Carried Out Using Renewable Energy Sources. For This Purpose, The Technical Planning Department Tga Will Examine A Variant Study Between Air-Water Heat Pumps With And Without Support From Pv, Solar Thermal Energy Or Pvt As Well As The Exclusively Seasonal Use (April To October) Of The Building. Due To The Type Of Use, High Hot Water Consumption Is Assumed. Heating Should Primarily Be Provided Via Surface Heating With Low Flow Temperatures. A Ventilation System Should Be Provided For The Shower And Changing Areas. Areas For Energy Generation Should Be Arranged Opposite The Building Between Two Sports Fields On A Grandstand Roof To Be Built, Provided That It Is Cost-Effective. The Renewable Yields Must Then Be Taken Into Account Accordingly In The Energy Certificate. The Planning Goal Is To Obtain An Integrative Overall Concept Of Structural Planning Content (Sustainability And Recyclability Of The Building Construction, The Extension And The Facade, Glass Area Proportion, External Sun Protection Structures, Orientation Of The Building In Relation To Solar Radiation, Ventilation Options, ...) And Specialist Planning Content Of The Technical Equipment (Ventilation Technology, Room Air Conditioning, Electrical Engineering And Control, Heating Technology With Renewable Energy Sources, ...). Technical Systems And Building Construction Are Optimally Coordinated With Each Other. Nature Conservation Concerns Must Be Taken Into Account. The Contractor Must Provide All Basic Services Of Hoai In The Structural Planning Service Profile. The Basis Of The Planning Is The Execution Of A Modular Timber Construction With Supporting Parts In Structural Timber Construction. A High Level Of Prefabrication Is Planned In Order To Keep The Construction Time On The Construction Site As Short As Possible. The Focus Of The Structural Planning On The Clients Side Is The Fulfillment Of Fire Protection Requirements In Collaboration With The Commissioned Fire Protection Planner As Well As The Planning Of The Open Circulation Areas On The 1St Floor (Arcade) And The Integration Of The Stairs In The Structural Timber Construction. The
Contact Information
Contact No.
000
Email
vergabestelle@ba-sz.berlin.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109849872
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.