1. The Subject Of The Order Is The Preparation Of Design Documentation Containing Design Solutions For The Construction Of A Water Supply Network Connecting Two Sections Of Existing Water Supply Networks In The Towns Of Rukosin And Turze. The Aim Of The Investment Is To Improve The Reliability Of The Communes Water Supply System And To Create An Inter-Zonal Power Supply System Between The Above-Mentioned. Towns. The Investment Is Being Carried Out As Part Of The Task Entitled: Construction Of The Rukosin - Turze Water Supply Link:• The Preliminary Route Of The Designed Network Is Planned In The Area Of Plots No.: 153/4, 166/11, 179/2, 180/2, 180/1, 181, 215, 214, 213, 212, 183/3, 183/4, 184/21, 184/22, 184/14, 184/4, 184/3, 185/1, 186/1, 187/1, 188/4, 188/6, 188/8, 189/1, 190/1, Rev. Turze And Plots No.: 48/1, 50/1, 49/1, 51/1, 52/1 And 46, Rev. Rukosin, Including Connection To The Existing Water Supply Networks In Plot No. 153/4, Rev. Turze And 46, Rev. Rukosin. The Reconstruction Of The Network On The Section From Plot No. 184/22 To Plot No. 153/4 Is Aimed At Eliminating The Worn-Out Water Supply System Made Of Asbestos-Cement Pipes. The Planned Water Supply Network Should Be Designed In Accordance With Technical Conditions No. 127/2025 Of April 11, 2025 Issued By Gtkom Sp. Z O. O. • There Is No Local Development Plan For The Plots Covered By The Investment. • The Approximate Length Of The Designed Network Is Approximately 2,400 M. B. The Ordering Partys Intention Is To Obtain/Order Such Design Documentation That Will Enable Obtaining A Building Permit/Construction Notification Together With This Permit/Notification In Accordance With Current Regulations (With A Certificate From The Staroste Of Tczew On The Lack Of Objection To The Submitted Construction Works Notification). If There Is No Need To Obtain A Building Permit Or Notification, The Designer Will Submit An Appropriate Declaration Along With The Documentation.2. Form Of Development Of Design Documentation: 1) The Ordered Design Documentation Includes The Following Studies, Which Are The Subject Of The Order: A) A Current Map For Design Purposes Of The Area Covered By The Task At A Scale Of 1:1000 Or 1:500 - (Paper Version - Carbon Copy Or Electronic Version With Licenses, Plus Pdf Format), B) Obtaining A Decision On The Environmental Conditions Of The Consent To Implement The Project (If Required), C) Obtaining A Decision On A Building Permit Or A Certificate From The Starosta Tczewskiego About The Lack Of Objection To The Submitted Construction Application, D) Obtaining A Decision On Determining The Location Of A Public Purpose Investment, E) Obtaining A Water-Legal Decision (If Required), F) Obtaining All Opinions, Arrangements And Permits Required By Specific Regulations (Including A Declaration Of The Right To Use The Land For Construction Purposes - On The Forms Of The District Office In Tczew), G) Geotechnical Research Of The Soil, Geotechnical Opinion (If Required), H) Developme
|