|
The Subject Of The Order Is: Maintenance Of Sidewalks And Non-Bituminous Surfaces Of The Streets Of Gorzowa Wielkopolski. The Task Includes Ongoing Maintenance According To The Ordering Partys Instructions: - Street Elements Such As: Concrete And Stone Curbs, Concrete Edges, Street Sewage - Construction Of Sidewalks And Non-Bituminous Surfaces: Parking Lots And Roads, And Regulation Of Wells For Underground Facilities (Water And Gas Valves, Telephone Wells, Sanitary Wells, Etc.) And Care Of The Root System Of Trees Located In The Surface Covered By Partial Renovation. Basic Materials Such As: Curbs Concrete, Edging, Paving Slabs, Concrete And Stone Cubes, Etc. May Be: - The Ordering Partys Materials Coming From The Demolition Of The Renovated Place Or Delivered From The Place Indicated By The Ordering Party (Demolition Materials Suitable For Re-Installation) From The Ordering Partys Warehouse. - New Materials Delivered By The Contractor. Concrete Paving Stones, Thickness 6 And 8 Cm Includes Cubes Of The Following Types: Euro, Uni, Behaton. Concrete Paving Stones - The Ordering Partys Material Includes The Stones As Above. And Additionally Concrete Slabs Of The Miter And Trylinka Type. The Scope Of The Task Includes: - Demolition Of Street Construction Elements (Surfaces, Substructure, Curbs, Edge Footings, Sewage,) - Removal Of Demolition Materials (Rubble) And Removal/Delivery Of Demolition Materials Suitable For Re-Incorporation, - Channeling, Profiling And Compaction Of The Substrate, - Setting Of Curbs And Edges, - Execution Of Cut-Off Layers And Foundation, - Drainage, - Laying The Surface With Concrete Paving Stones. 6 And 8 Cm, - Laying Surfaces Made Of Concrete Paving Slabs, Stone Cubes And Hexagonal Concrete Slabs. The Subject Of The Order Also Includes: - 24-Hour On-Call Duty To Report Damage To Sidewalks And Non-Bituminous Street Surfaces That Require Protection, - Securing Damage To Sidewalks And Non-Bituminous Surfaces Within 2 Hours From The Moment Of Reporting, - Carrying Out A Project To Change The Traffic Organization For The Duration Of The Works And Its Implementation For Works That Constitute A Traffic Disruption. Arrangements, - Execution, Maintenance And Liquidation Of Temporary Traffic Organization And Security Of The Work Area, - Restoration Of The Work Area To Its Original Condition After Completion Of Construction Works. All Materials Used To Complete The Order Should Meet The Requirements Of Individual Ssts. In Addition: - While Performing Works In The Road, The Contractor Is Obliged To Have Devices And Road Markings Ensuring Proper Security Of The Work Area. Mark Them Correctly, In Accordance With The Annex To The Regulation Of The Minister Of Infrastructure Of July 3, 2003 On Detailed Technical Conditions For Road Signs And Signals And Road Traffic Safety Devices And The Conditions For Their Placement On Roads, Execution For Works Constituting An Obstruction To Traffic, Traffic Organization Design For The Duration Of
|