|
1. Subject Of The Order 1.1. The Subject Of The Order Is The Renovation Of The Ełk Narrow Gauge Railway Track On The Ełk - Sypitki Railway Line At Km 0.000 - 15.250.2. The Scope Of The Order Includes: 2.1. At Km 1,350 - 1,900: Replacement Of Sleepers: 850 Pieces, Disassembly Of Individual Used Sleepers Together With Accessories And Reassembly Of These Accessories Together With New Sleepers, Adjustment Of The Contact Distance To Eliminate Rail Creep, Disposal Of Sleepers Unsuitable For Re-Use, Making Appropriate Holes For Fastening Screws In Narrow Gauge Sleepers Wooden, - Installation Of All Rails And Accessories Together With The Replacement Of Missing Or Worn-Out Track Accessories When Replacing Narrow-Gauge Wooden Sleepers Or Turnout Subs, - Tamping Of Narrow-Gauge Wooden Sleepers Along The Entire Length Indicated For Replacement, Leveling And Profiling The Track, Covering It With Ballast, Twisting The Tracks Together With Splints And Making Missing Holes On All Joints And Tidying Up The Footing Tracks.2.2. At Km 2.040 - 2.330: - Replacement Of 450 Sleepers, Disassembly Of Individual Used Sleepers Together With Accessories And Reassembly Of These Accessories Together With New Sleepers, - Disassembly Of Two S42 Type Rails (At Km 2.105) And Their Reassembly With Shifting The Contacts So That They Are Not Opposite The Contacts Of The Second Rail, In Order To Eliminate, I.E. Square Arc, Adjusting The Contact Distance To Eliminate Rail Creep, Disposal Of Sleepers Unsuitable For Reuse, Making Appropriate Holes For Fastening Screws In Narrow-Gauge Wooden Sleepers, Assembling All Rails And Accessories Together With Supplementing Missing Or Worn-Out Track Accessories When Replacing Narrow-Gauge Wooden Sleepers Or Turnout Subs, Tamping The Sleepers Wooden Narrow-Gauge Railways Along The Entire Length Indicated For Replacement, Leveling And Profiling The Track, Covering It With Ballast, Twisting The Tracks With Splints And Making Missing Holes At All Joints, And Tidying Up The Track Footing.2.3. At Km 5,150 - 5,470: - Replacement Of 510 Sleepers, Disassembly Of Individual Used Sleepers Together With Accessories And Reassembly Of These Accessories Together With New Sleepers, - Disassembly Of 4 S42 Type Rails And Reassembly Of Them In Order To Move The Contacts Connecting The Rails Behind Or In Front Of The Rail-Road Crossing, - Installation Of Two Internal Cbp Plates Of Size (3000 X 616 X 140 Mm) Onto A 750 Mm Track For Replacement (At Km 5.418) Along With Compacting The Ballast Within The Crossing, - Disposal Of Sleepers That Are Not Suitable For Re-Use, - Making Appropriate Holes For Fastening Screws In Narrow-Gauge Wooden Sleepers, - Assembling All Rails And Accessories Along With Replenishing Missing Or Worn-Out Track Accessories For The Replaced Sleepers Or Narrow-Gauge Wooden Turnout Subs, Strengthening Of Narrow-Gauge Wooden Sleepers Along The Entire Length Indicated For Replacement, Leveling And Profiling The Track, Covering It W
|