1. The Subject Of This Study Is A Land Development Project For A Construction Project For An Investment Entitled: Construction Of A Municipal Road In Polskie Łąki With A Length Of Approximately 920 M. The Planned Investment Is Located In The Kuyavian-Pomeranian Voivodeship, In Świecie County, In The Bukowiec Commune, Within Polskie Łąki. The Length Of The Designed Road Is 903.72 M (According To The Assumed Kilometers). The Investment Task Includes: - Preparation Of The Site For Construction (Marking The Area), - Demolition Of Road Elements, - Cutting Down Colliding Trees And Shrubs, - Removal Of Stumps Left By The Cut Trees And Shrubs Together With Filling The Pits With Sand And A Reinforcing Layer Of Cement-Stabilized Soil Rm = 2.5Mpa And Reconstruction Of Existing Surface Structures, - Reconstruction Of The Intersection With The District Road, - Construction Of Road Lighting And Dedicated Lighting At The Crossing For Pedestrians Through The District Road, - Protection Of Colliding Telecommunications And Power Infrastructure (Note: If Telecommunications Cables Are Discovered During Road Construction Works, Protect The Earth Cables Against Damage With Two-Part Protective Pipes - In Accordance With The Agreement With Orange Polska S.A.), - Relocation Of The Colliding Hydrant, - Removal Of A Layer Of Fertile Soil (Topsoil), - Execution Of Earthworks, - Construction Of A Trough For The Structures Of Individual Surfaces, - Profiling And Compaction Of The Subgrade, - Setting Of Stops, Curbs And Concrete Edges, - Making A Drainage Layer Of Sand, - Making A Layer Of Improved Subsoil Made Of Cement-Stabilized Soil With Rm = 2.5Mpa, - Making A Base Of Mechanically Stabilized Crushed Aggregate 0/31.5 Mm, - Making A Road Surface Of Asphalt Concrete (Binding W-Wa And W-Wa Abrasive), - Construction Of Exit Surfaces Made Of Asphalt Concrete, Concrete Paving Stones (Color) And Mechanically Stabilized Crushed Aggregate 0/31.5 Mm, - Construction Of Green Areas Including Profiling, Topsoil And Grassing, - Execution Of Finishing Works, - As-Built Inventory. Design Assumptions For The Municipal Road Under Construction: - Road Class ................................................................................................................................................... D - Traffic Category .................................................................................................................... Kr1 - Design Speed ..................................................................................................... 30 Km/H - Road Width ..................................................... 4.50 M (With Local Widening Up To 6.50 M) - Cross-Slope Of The Road On A Straight Line ..................................................... 2.0% - Width Of The Pedestrian Road And Stop Platform ..................... 1.80 M (2.50 M - At The Crossing) - Transverse Slope Of The Pedestrian Road And Bus Stop Platform ... 1.0% - 3.0% - Width Of Roadsides ................
Contact Information
Address
Gmina Bukowiec,Bukowiec,86-122,Kujawsko-Pomorskie,Pl618 - Świecki
Email
inwestycje@bukowiec.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109752627
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.