The Objects Of The Contract Are: Malminhaa Bridge: The Construction Project Includes The Demolition Of The Existing Wooden Bridge And The Construction Of A New Reinforced Concrete Slab Bridge. The Site Will Build E.G. Inlet Embankments, Water Supply And Lighting. The Work Includes E.G. Installation Of A 20 Kv Overhead Line In The Ground And Directional Drilling Of A 110 Mm Water Line And Drill Piling.Läksyporti Underpass: In The Project, Reinforced Concrete Cantilever Slab Bridges Will Be Built In Place Of The Old Steel Pipe Bridge. In Addition, Park Tracks Related To Soukanväylä And The Underpass Will Be Built. The Work Includes E.G. Earth-Cutting Work, Filling Of Embankments And Structural Layers, Lighting Installation Work, Skilled Construction Work (Bridges), Piling Work, Green Work (E.G. Tree Planting), Installation And Construction Work Of Water Supply Lines, District Heating Pipes And Other Technical Networks, As Well As Stone And Asphalt Work. Renewable, Fossil-Free Fuels Are Used In The Construction Machinery And Earthmoving Trucks Of The Project.
Contact Information
Address
Pl 640
Contact No.
+358468772296
Email
pasi.heiskanen@espoo.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109743433
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.