|
1.1Mobilization And Demobilization, 1.2Supply And Placement Of Work Sign In Galvanized Sheet (3.00 Painted, 1.3Topographic Location From Twenty One (21) To Fifty (50) Reference Points, Including Marking Stake, 1.4Chemical Toilet Location, Dimension (110X120x230)Cm, Standard Line, Containing One (1) Sink/Hand Sanitizer, Including Maintenance And Mobilization/Demobilization, 1.5Siding With Polyethylene Mesh, 02/27/2026 - 14:33:35, 1.6Removal And Reinstallation Of Pre-Molded Concrete Curb With Reuse, 1.7Removal And Replacement Of Pavement In Interlocking Or Hexagonal Concrete Block, With Reuse Of Blocks, Including Supply With Application And Mechanized Regularization Of Sand Mattress, 1.8 Covered Area In Fibercement Tile For Benches - Der-Mg Standard, 2.1 Mechanized Excavation Of Trench With Prof. Up To 1.5 M (Average Upstream And Downstream/One Composition Per Section), Backexcavation. (0.26 M3), Width From 0.8 M To 1.5M On 1St Category Soil, In Locations With High Level Of Interference. Af_02/2021, 2.2Manual Excavation Of Trenches With A Depth Of Less Than Or Equal To 1.5M, 2.3Pilling Of The Bottom Of Trenches With A Plate, 2.4Shaping And Unshaping Of Plasticized Plywood, Esp. 12Mm, Reuse (3X), 2.5Cutting, Bending And Assembling Ca-60 Steel Diameter (4.2Mm To 5.0Mm), 2.6Cutting, Bending And Assembling Ca-50 Steel Diameter (6.3Mm To 12.5Mm), 2.7Concrete Fck = 25Mpa, Trace 1:2, 7:3 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With 400 L Concrete Mixer. Af_05/2021, 2.8Launching With Use Of Buckets, Densifying And Finishing Concrete In Structures., 2.9Filled Concrete Block Masonry Without Frame, In Concrete With Fck Of 15Mpa, Esp. 19Cm, For Coating, Including Mortar For Laying, 2.10Gravel Ballast 2 Or 3 Manually Piled, 2.11Pvc Pipe D=75Mm (3), 2.12Compacted Trench Backfill With Vibrating Plate Equipment (Or Socket) - (Layers Of 20Cm Height), 2.13Transportation Of Material Of Any Nature In Truck, Distance Greater Than 5Km And Less Than Or Equal To 10Km, Within The Urban Perimeter, Exclusive Loading, Including Unloading, 3.1Manual Regularization And Mechanized Compaction Of Land With Vibrating Plate, Exclusive Deforestation, Removal, Cleaning/Mowing The Land, 3.2Plastic Cone For Traffic Channeling - Use Of 150 Cycles - Supply, 01 Implementation And 01 Daily Removal, 3.3 Concrete Transition Slab Prepared On Site With Concrete Mixer With Fck Of 15Mpa, Esp. 7Cm, Including Frame, Slatted And Straightened Finish, 3.4 Drainage Channel, Pre-Molded, Half-Cane Type, Diameter 30Cm, Excluding Lid, Including Laying In Mortar, Ratio 1:3 (Cement And Sand), Excavation, Transport And Removal Of Excavated Material (In Bucket), 3.5Grass Planting Emerald In Slabs, Including Topsoil And Conservation For Thirty (30) Days, 3.6Final Cleaning For Delivery Of The Work, 3.7Trucked 10,000 L Water Truck, Total Gross Weight 23,000 Kg, Maximum Payload 15,935 Kg, Wheelbase 4.8 M, Power 230 Cv, Including Steel Tank For Water Transport - Chp Daytime. Af_06/2014, 4.1Local Administration
|