Pedestrian Ways Construction Work – Replacement Of The Square And The Axis Of Aristotle. The Project Execution Area (Approximately 32,500 Sq M) Extends From The Beach Front To Egnatia Street And, Specifically, Along The Old Beach Curb To The Egnatia Street Curb (With The Exception Of The Storm Drains That Penetrate Nikis Avenue To The Seawall And End Up At The Sea) And, In Width, From The Inner Beach Of The Arcades On Either Side Of Aristotles Axis. Construction Works (€9,958,128.52 + G&E (18%) €1,792,463.13+ Contingencies (9%) €1,057,553.24) = €12,808,144.89, It Works (€3,836,101.70+ G&E (18%) €690,498.31+ Contingencies (9%) €407,394.00) = €4,933,994.01, Plumbing Works (€1,166,737.34+ Ge & Oe (18%) €210,012.72+ Contingencies (9%) €123,907.51) = €1,500,657.57. Total Work €19,242,796.47 Revision €1,549,282.74 Additional Payment Clause 1%= €207,920.79, Vat(24%)=€5,040,000.00. Final Total: €26,040,000.00. A/A Esidis 218435.
|