|
Bids Are Invited For Preventive Maintenance & Load Testing/ Inspection Of Material Handling Equipments (E.G. Hoists, Eot Cranes, Mobile Cranes & Forklifts Etc.) And Maintenance Of Rolling Shutters.; 1.0 PM of Cranes & Hoists 1.01 Six Monthly preventive maintenance of EOT Crane (capacity 2 ton to 75 ton) / Electric hoist (0.5T to 12.5T) as per the approved checklist 200.0 Nos. 1.02 Annual preventive maintenance of EOT Crane (capacity 2 ton to 75 ton)/Electric hoist (0.5T to 5T) as per the approved checklist 100.0 Nos. 2.0 Load testing of Crane & Hoist, Chain pulley block, mobile crane, forklift, max puller 2.01 Annual load testing of EOT crane (Capacity 2 ton to 20 ton). 40.0 Nos. 2.02 Annual load testing of EOT crane (Capacity 30 ton to 75 ton) 10.0 Nos. 2.03 Annual load testing of Electric hoist (Capacity 0.5 to 12.5 Ton). 50.0 Nos. 2.04 Annual load testing of mobile cranes & DPT of hook (Capacity 55 ton & 12 ton) 2.0 Nos. 2.05 Annual load testing of forklifts (Cap 1 ton to 10 ton) 8.0 Nos. 2.06 Annual PM & load testing of manual hoist ( mono rail with chain pulley block) capacity 0.5 ton to 5 ton 180.0 Nos. 2.07 Annual PM & load testing of Chain Pulley block (SWL0.5 ton to 5 tonn) 185.0 Nos. 2.08 Annual PM & load testing of Hydraullic Pellet Trolley (SWL:upto 3 Tonn) 70.0 Nos. 3.0 Inspection of Specila liftin tool tackles, D-shackle,eyebolt and special lifting tackles 3.01 Dismantling, visual & DPT, boxup of HP turbine rotor lifting beam 2.0 Nos. 3.02 Dismantling, visual & DPT, boxup of LP turbine rotor lifting beam 2.0 Nos. 3.03 Dismantling, visual & DPT, boxup of Turbine easing gear 2.0 Nos. 3.04 Dismantling, visual & DPT, boxup of LP turbine outer casing lifting pin 8.0 Nos. 3.05 Dismantling, visual & DPT, boxup of Turn buckle for lifting HP turbine casing 2.0 Nos. 3.06 Dismantling, visual & DPT, boxup of PCP lifting pin-plate assembly consisting of 4 nos. of plates and 6 nos. of pins. 2.0 Nos. 3.07 Dismantling, visual & DPT, boxup of chlorine toner lifting beam (attached to manual hoist Nos. 0-76230-MH-07 of 2T capacity) consisting of 1 no. of plate and 4 nos. of pins/bolts, 1 No. of D shackles, 3 nos. of hook. 2.0 Nos. 3.08 Annual inspection of slings, D-shackles & eye bolts. 1900.0 Nos. 4.0 Maintenance of rolling shutter 4.01 Six Monthly preventive maintenance of turbine building motor operated rolling shutter (size max. 5mx12m). 20.0 Nos. 4.02 Complete Overhauling of Rolling of shutter (Size Max. L-6 Mtr x H-7Mtr, 5Mx12M) 25.0 Nos. 5.0 Need based maintenance of EOT cranes, hoists and Shutter 5.01 Wire rope replacement of EOT crane/ electric hoists (if required) 2.0 Nos. 5.02 Overhauling of LT gearbox /CT gearbox/ Main hoist gearbox of EOT crane/ electric hoist having SWL up to 75 Ton (if required) 3.0 Nos. 5.03 Maint. / replacement of thruster /electromagnetic brake of crane & hoist (if required ) 15.0 Nos. 5.04 Revamping /redressing of control panels of crane & hoist, if required 8.0 Nos. 5.05 Replacement of pendant/its set of button for EOT Crane/Hoist 8.0 Nos. 5.06 Replacement / maintenance of limit switch/fuse of crane & hoist, cleaning of contacts, moisture etc if required 65.0 Nos. 5.07 Maintenance/ replacement of wheel (each) of crane& hoist 6.0 Nos. 5.08 Laying of power cable having outer dia meter 6 mm to 80 mm in existing cable trays. 300.0 Nos. 5.09 Removal & shifting of manual hoist/CPB from one location and its installation at another location. 22.0 Nos. 5.1 Motor overhauling of motor From 0.18 KW to 3.7 KW, as per applicable procedure . 5.0 Nos. 5.11 Motor overhauling of motor From 5.5 KW to 22.5 KW, as per applicable procedure 4.0 Nos. 5.12 Motor overhauling of motor From 30.0KW to 75.0 KW, as per applicable procedure . 2.0 Nos. 5.13 Decoupling of Motor and Gear Box,allignment correction and coupling. 4.0 Nos. 5.14 Removal and Fixing of coil spring of matching size and shape of shutter. 20.0 Nos. 5.15 Removal and Fixing of lower/upper gear assembly of shutter 10.0 Nos. 5.16 Removal and Fixing of shutter iron strips as per matching size. 50.0 Nos. 5.17 Replacement of shutter rotor cover of matching size. 6.0 Nos. 5.18 Repair of shutter rotor and coil spring 20.0 Nos. 5.19 Rewinding of Electromagnetic (EM) brake coil of crane . 20.0 Nos. 6.0 Maintenance coverage and Crane operation 6.01 Maintenance coverage for attending complaint of crane/hoist upto 8 hrs during normal working day. 130.0 Nos. 6.02 Maintenance coverage for attending complaint of crane/hoist or coverage during lifting of any critical load upto 4 hrs during off hrs or holiday. 200.0 Nos. 6.03 EOT Crane/Electric Hoist operation upto 8 hrs during normal hours on any working day. 600.0 Nos. 6.04 EOT Crane/Electric Hoist operation upto 4 hrs during off hours, Sunday, Holiday 360.0 Nos. 7.0 Supply Items 7.01 Supply of new brake coil of Electro magnetic (EM) brake for different cranes. 12 Nos. 7.02 Supply of strip /spring for shutters (Kg) 150 Kg 7.03 Supply of Electro hydraulic Thrust brake suitable for 300 mm to 400mm drum dia with 18 kg load to work on 3 phase 50C/s,400/440 volts, braking torque 42 Kg.M without drum 7 Nos. 7.04 Supply of Electro hydraulic Thrust brake suitable for 100 mm to 200 mm drum dia with 18 kg load to work on 3 phase 50C/s,400/440 volts,braking torque 42 Kg.M without drum 7 Nos. 7.05 Supply of Chain Pulley Block, SWL-1 Ton, Lift -10 Mtrs 2 Nos. 7.06 Supply of Chain Pulley Block, SWL-2 Ton, Lift -10 Mtrs 2 Nos. 7.07 Supply of Chain Pulley Block, SWL-3 Ton, Lift -10 Mtrs 2 Nos. 7.08 Supply of Chain Pulley Block, SWL-5 Ton, Lift -10 Mtrs 1 Nos. 7.09 Manual Hoist Trolley with Chain Pulley Block each having SWL:5.0 Tonn with length of chain upto 10 Meter 2 Nos.
|