4.1. The Subject Of The Order Is The Implementation Of Construction Works As Part Of The Project Titled: Expansion Of Municipal Road No. 109728L From Km 0+20 To Km 0+400 In The Town Of Borów.4.2. Municipal Road No. 109728L Is A Class D Public Road (Access Road). The Expansion Covers A Section Of The Road In Question With A Length Of 380 Meters. The Designed Basic Road Width Of The Municipal Road On The Section From Km 0+020 To Km 0+353 Is 4.5 M (2 Lanes Of 2.25 M Each). Road Cross Section 1/2. The Designed Width Of The Roadsides Is 0.75 M. The Designed Basic Width Of The Road On The Section From Km 0+353 To Km 0+400 Is 3.50 M. Road Cross-Section 1/1. The Designed Width Of The Roadsides Is 0.75 M. The Project Provides For The Construction Of Exits To Properties Adjacent To The Road. The Designed Road Drainage System Consists Of Roadside Ditches, Culverts Under The Exits, Which Connect Subsequent Sections Of Ditches, Culverts Under The Road. In The Area Covered By This Study, The Following Infrastructure Exists: A) Power Grid, B) Telecommunications Network, C) Water Supply Network. Due To The Occurring Collisions, The Contractor Must Inform The Managers Of The Conflicting Utilities About The Works Carried Out, In Accordance With The Agreements Issued By These Managers. The Detailed Descriptive Part And The Graphic Part Can Be Found In The Design Documentation. Construction Works Should Be Carried Out In Accordance With The Construction Design, Technical Design, Permanent Traffic Organization Design, Technical Specification For The Execution And Acceptance Of Construction Works, And Bills Of Quantities. The Quantities Given In The Bill Of Quantities Are Indicative And Do Not Constitute The Basis For The Execution And Settlement Of The Concluded Contract. The Scope Of Work To Be Performed Includes, Among Others: 1. Securing The Work Site, 2. Providing The Necessary Materials, Equipment And Devices To Perform The Subject Of The Contract, 3. Carrying Out Preparatory Works, 4. Carrying Out All Works In Accordance With The Principles Set Out In The Design Documentation, Principles Of Technical Knowledge, Applicable Construction Law And Implementing Regulations To This Act, And Stwiorb, 5. Carrying Out All Activities Required By The Construction Law And Necessary To Perform The Subject Of The Order. Scope Of Works: As Part Of The Task Related To The Expansion And Construction Of A Municipal Road In The Town Of Borów, The Following Works Should Be Performed: A) Preparatory Works, B) Demolition Works, C) Securing The Power And Telecommunications Infrastructure, D) Land Profiling, E) Construction Of Embankments And Excavations, F) Construction Of A Bed For New Construction Layers And Curbs, G) Construction Of The Road Surface And Exits, H) Execution Drainage, Culverts And Street Sewage, I) Surface Construction Of All The Above-Mentioned Elements, J) Development And Tidying Up Of The Area Around The Investment, Pavement Structure Pavement Structures Were Desi
|