As Part Of Part I - Extension Of Municipal Road No. 181006N On The Radomno-Gryźliny Section - Stages Ii And Iii, The Following Works Will Be Performed:4.2.1 Part I - Stage Ii4.2.1.1. Road Industry: A) Preparatory Works: - Preparatory, Earthwork And Demolition Works - Forming And Compacting Embankments Together With Compaction - Installation Of Two-Part Casing Pipes, Dia. 230 Mm, (Excavation, Filling With Sand And Compaction) - Cutting Down Trees And Bushes, Grubbing Up Stumps Along With Filling With Sand And Removal The Bottom Of The Ditch Made Of Stone Cubes On A Cement-Sand Ballast 1:4 - Concrete Slope Drain Laid On A Cement-Sand Ballast 1:4 Gr. 4 Cmc) Asphalt Concrete Roadway, Cobblestone Surface Near The Road, Exit - Frost-Protective Layer Made Of A Mixture Bound With A Hydraulic Binder (Cement) C1.5/2 Thick. 22 Cm/30 Cm - Soil Replacement, Backfilling With Concrete Rubble 31.5/63 Mm - Cross-Reinforced Geogrid With Arrangement, In Accordance With Sst - Concrete Road And Driveway Curbs - Bases Made Of A Mixture Bound With C8/10 Cement Binder, Layer Thickness 20 Cm - Foundation Made Of An Unbound Mixture Of Aggregate 0/31.5 Mm, Mechanically Stabilized Bottom Layer With A Thickness After Compaction Of 12 Cm - Subbase Made Of An Unbound Mixture Of Mechanically Stabilized Aggregate 0/31.5 Mm, Upper Layer With A Thickness After Compaction Of 8 Cm - Binding Layer Of Ac16w Asphalt Concrete, Thickness. 5 Cm - Ac11s Asphalt Concrete Wearing Course, Thickness. 4 Cm - Surface Made Of Concrete Cubes, 100% Color, Thickness 8 Cm, Laid On A Cement-Sand Ballast 1:4 Gr. 3 Cm, Including Adjustment Of Devicesd) Asphalt Concrete Ramps, - Frost-Protective Layer Made Of A Mixture Bound With A Hydraulic Binder (Cement) C1.5/2 Gr. 22 Cm - Foundation Made Of An Unbound Mixture Of 0/31.5 Mm Mechanically Stabilized Aggregate, Lower Layer, After Compaction, 12 Cm Thick - Foundation Made Of An Unbound Mixture Of 0/31.5 Mm Mechanically Stabilized Aggregate, Upper Layer, After Compaction, 8 Cm Thick - Binding Layer Of Ac16w Asphalt Concrete, Thickness. 5 Cm - Ac11s Asphalt Concrete Wearing Course, Thickness. 4 Cme) Slopes Made Of Concrete Cubes - Frost-Protective Layer Made Of A Mixture Bound With A Hydraulic Binder (Cement) C1.5/2 Gr. 22 Cm - Concrete Edging, Dimensions 8X30 Cm - Bases Made Of A Mixture Bound With C8/10 Cement Binder. Layer Thickness After Compaction: 20 Cm - Surface Made Of Colored Concrete Cubes, 100% Thick. 8 Cm Laid On A 1:4 Gr Cement-Sand Ballast. 3 Cm, Including Regulation Of Devicesf) Access To The Property Made Of Concrete Blocks - Frost-Protective Layer Made Of A Mixture Bound With A Hydraulic Binder (Cement) C1.5/2 Gr. 22 Cm - Concrete Edging, Dimensions 8X30 Cm - Bases Made Of A Mixture Bound With C8/10 Cement Binder. Layer Thickness After Compaction: 20 Cm - Surface Made Of Gray, Colored Concrete Cubes, 20% Thick. 8 Cm Laid On A 1:4 Gr Cement-Sand Ballast. 3 Cm, Including Adjustment Of Devices G) Finishing - Felling Of Existing Roadsides Togeth
|