|
Task No. 1: Location: Jedlina-Zdrój Ul. Sienkiewicza 2, Plot No. 59/4, Precinct 0004 Jedlina-Zdrójthe Subject Of This Order Includes The Execution Of: 1. Thermal Modernization Of The Facade - A) Facade - Protection Of Joinery, Demolition Of Gutters And Downpipes, Removal Of Plaster Coatings, Cleaning The Facade Of Dust And Paints, Strengthening The Substrate, Repairing Defects And Cracks In Internal And External Walls, Leveling Uneven Wall Surfaces, Making A Base For The Facade Layer, Making A Facade Layer With Heat-Insulating Plaster, Restoring The Facade Details With A Drawn Profile, Painting The Facade Twice, Cleaning And Hydrophobizing The Existing Sandstone Cladding In The Ground Floor Area, Replacing The Plinth With A Natural Sandstone Cladding In The Damaged Areas Along With Grouting And Hydrophobizing, Making New Sheet Metal Flashings Adapted To The Thickness Of The Insulated Sheet Metal Walls Titanium-Zinc, Installation Of A Protective Net With Spikes Against Birds, Removal Of Rubble And Waste. The Colors Of The Facade Should Be Agreed With Wuoz In Wrocław At The Stage Of Execution Of The Works. B) Plinth Zone - Earthworks Within The Underground Walls, Cleaning Of The Walls, Grouting, Waterproofing And Moisture-Proofing Of The Walls Using Bituminous Technology, Securing The Walls With Dimpled Foil, Backfilling The Excavation With Gravel, Laying A Frame Of Concrete Edges On A Cement-Sand Ballast, Execution Gravel Band And In The Ground Floor Area Around The Perimeter Of The Entire Building, Gravity Injection. C) Access To The Building - Cutting Off Concrete Layers At The Access To The Building And The Threshold, Making A New Concrete Floor And Laying A Surface Layer Of External, Anti-Slip Ceramic Tiles. 2. Thermal Insulation Of The Attic - Demolition Of Wooden Attic Floors, Installation Of Thermal And Anti-Sound Insulation With Mineral Wool - One Layer 25 Cm Thick, Construction Of A New Floor From Impregnated Boards. 32 Mm, Laying A New Pvc Lining, Sealing The Plain Roof Tiles And Replacing Titanium-Zinc Sheet Metal Flashings.3. Replacement Of Window Joinery - Replacement Of All Window Joinery With Pvc Windows, Maintaining The Original Architectural Drawing And Dimensions, With A Transmission Coefficient Of Not Less Than 0.9 W/M2k. Windows Must Have Window Vents. Replacement Of Window Sills. 4. Replacement Of External Door Joinery - Replacement Of External Doors On The Front Elevation And Rear Elevation - Door Leaf And Frame. The Dimensions, Shape And Structural Division Of Joinery Are Subject To Agreement With Wuoz In Wrocław.5. Installation Of 4 Type A Bird Nesting Boxes On The Building Or In Its Surroundings And 1 Bat Box On The Building Or In Its Surroundings, In Accordance With The Guidelines Of The Environmental Expert Opinion. Ii. A Detailed Description And Method Of Execution Of The Order Is Included In The Draft Contract, Architectural And Construction Design Titled: Thermal Modernization Of A Residential Building 58-330 Jedlina-
|