Description Of The Construction Project The Construction Project Includes: Seppäläntie Plv. 65-205 Construction, Including The Seppäläntie Jkpp Route, Installation Of Storm Water Systems And Lighting To The Extent Presented In The Documents, Fully Completed. The Contract Includes The Following Work Phases: Demolition Work, Foundation Work, Drainage, Protective Piping, Surface Structures, Green Areas, Road Signs, Traffic, Signage And Control Systems And Other Work Phases Presented In The Documents, As Well As Materials. The Client Is Responsible For The Felling Of Wood. Contrary To The Work Description, A Two-Pipe Railing Will Be Installed On Seppäläntie, Which Will Be Connected To The Railing Of Helsingintie. Contrary To The Work Description, The Edge Supports Of Helsingintie Will Be Made Of Granite And The Edge Supports Of Seppäläntie Will Be Made Of Concrete. Installation Of The Storm Water System According To The Documents, The Work Includes The Following Work Steps: Construction Of The Storm Water Line At Seppäläntie Plv 65-205. Installation Of Lighting, Includes The Following Work Steps: Old Lighting Equipment Demolition According To The Documents. Installation Of Protective Cabling Lines And Ground Cabling For Lighting. Foundation Work For Poles And Installation Of Poles, Lighting Devices With Materials, As Well As All Work Steps And Materials Presented In The Documents. Separate Plans And Lists Of Quantities Have Been Prepared For Streets, Storm Water Systems And Lighting. The Lists Of Quantities Attached To The Request For Tender Are The Initial Information For The Tenderer, For The Calculation Of Costs. About 100M Of Guardrail Replacement On Seppäläntie Will Be Added Outside Of Afrys Plan. The Old Railing Will Be Dismantled And A New Tertu Wood-Clad Railing Will Be Installed In Its Place, Collision Resistance Class N2. The Work Includes All Materials And Work In The Scope Presented In The Documents, Fully Completed. Work On The Site Can Begin On April 23, 2026. The Work Must Be Completely Completed And Received By August 31, 2026.
Contact Information
Address
Mannerheiminkatu 4
Email
johan.lindholm-roms@loviisa.fi
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109678184
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.