|
Medical Equipments - Delivery Of Medical Equipment And Accessories For The Electrophysiology Laboratory And The Hemodynamics Laboratory, Modernization Of The Electrophysiology Laboratory And Performance Of Adaptation And Installation Works Necessary To Install And Launch New Medical Equipment - Project Number: Kpod.07.02-Ip.10-0327/25 Improvement Of The Quality And Accessibility Of Cardiology Services Through The Modernization And Equipment Of The Workrooms. I. The Subject Of The Order Includes: 1. Preparation Of A Concept For The Arrangement Of Rooms For The Performance Of Adaptation And Installation Works Necessary To Install And Put Into Operation New Medical Equipment In The Form Of 2 Angiography Machines And Preparation Of As-Built Documentation (Measurements Of Completed Installations, Checking The Operation Of The Installed Devices). 2. Replacement Of The Power Supply Installation Of The Electrophysiology And Hemodynamics Laboratory On The Section Of The Spzoz Main Switchboard In Garwolin - Electrophysiology And Hemodynamics Laboratory And Preparation Of As-Built Documentation (Measurements Of The Completed Installation, Checking The Operation Of The Installed Devices). 3.Preparation Of Documentation Necessary For The Ordering Party To Obtain Administrative Decisions Authorizing The Launch Of The Installed New Medical Equipment In The Form Of 2 Angiography Machines. 4. Modernization Of The Rooms Of The Electrophysiology Laboratory Consisting Of: 1) General And Finishing Works: A) Disassembly Of Floor Coverings And Unnecessary Coverings, B) Demolition Of Partition Walls According To The Approved Concept Of Room Arrangement, C) Removal And Disposal Of Waste Resulting From Modernization Works, D) Construction Of Partition Walls According To The Accepted Concept Of Room Arrangement, E) Repair Of Existing Floors And Additions (Self-Leveling Screeds), F) Necessary Repairs And Plastering In Places Of Installation Passages, G) Installation Of Electrically Conductive Floor Coverings, H) Replacement Of Suspended Ceilings, I) Implementation Of The Necessary Installation Of Ventilation Ducts, J) Performance Of Painting Works, 2) Electrical Installation Works: A) Disassembly Of Unnecessary Installations, Fixtures, Accessories, B) Installation Of Lighting Fixtures Led, C) Replacement Of Equipment, D) Adaptation Of The Existing Power Supply For The Needs Of The Angiography Machine And The Needs Of Other Devices, E) Installation Of An Electrical Switchboard In Accordance With The Requirements Of The Angiography Machine And Other Devices, As Well As Cabling, F) Installation Of It Network Sockets According To The Approved Room Arrangement Concept, G) Installation Of Trays, Cable Channels For The Cabling Of The Angiography Machine And Medical Equipment, H) Installation Of Safety Switches And Warning Lamps, I) Providing Power Supply For Sanitary Devices, J) Replacing The Telecommunications Installation - Adding New Computer Sockets In Accordance With The Guidelines Of Medical Device Suppliers, K) Connecting A Computer Network To The Existing Lpd (Local Distribution Point), L) Adapting The Installation Of Fire Detectors. To The New Room Location System, 3) Sanitary Works: A) Adaptation Of The Ventilation System To The Requirements Of Applicable Regulations, B) Reconstruction Of Ventilation Ducts, C) Installation Of Diffuser Filters, Steel Grilles, D) Installation Of The Necessary Air Conditioning, E) Adaptation Of The Sewage System - Installation Of Condensate Installation, F) Substructure For Devices, G) Installation Of Ventilation Ducts, 4) Furniture Equipment: A) Construction Furniture Studio According To The Approved Arrangement Concept
|