|
The Subject Of The Order Are Renovation And Conservation Works Of The Buildings Facade, In Particular: 1 Renovation And Renovation Of The Facade, · Removal Of Damp, Cracked And Detached Plaster Fragments, · Drying Of Walls And Re-Applying Plaster Coatings, · Local Repairs Of Scratched Surfaces (Without The Need For Chipping), · Reprofiling And Repair Of Deformed Cornices (Window Cornices, Above-Window, Inter-Story, Crowning), · Repair And Supplementation Of Window Trims And Other Architectural Details, · Repair Of Plinth Plasters, · Painting Of Facades After Repairs, · Renovation Of Terraces (In Accordance With Drawing Documentation), · Execution Of Sheet Metal Work.2 Window Joinery · Replacement Of Parts Of Window Joinery With New Wooden Ones (Four- And Eight-Leaf Windows), · Preservation Of Historical Division And Details, · Individually Made Windows Based On The Existing Ones, · Use Of Triple-Glazed Packages (Umax ≤ 0.9 W/M²k), · Installation Of Hygro-Controlled Or Rebate Vents, · External Window Sills Made Of Titanium-Zinc Sheet, · Internal Wooden Window Sills, · Joinery Color: Ral 8022.3, Door Joinery, · Renovation Of Wooden Doors (D1, D2, D3) While Maintaining The Original Fittings, · Replacement Of Selected Doors (Including D4, D5 Patio Doors), · Replacement Of Secondary Ornamental Glazing With Transparent Glass, · Construction Of Wooden Patio Doors With Fixed Sidelights, · Use Of P4 Safety Glass In Glazed Doors, · Meeting Fire Safety Requirements (Evacuation Wing At Least 0.9 M Clear). 4 Gutters And Downspouts · Replacement Of Gutters And Downpipes, · Material: Titanium-Zinc Sheet, Corrosion-Resistant, Patinating. 5 Nature Of The Works: · Renovation And Conservation, · Reconstruction (Architectural Details), · Partially Modernization (Replacement Of Joinery, Improvement Of Thermal Parameters). A Detailed Description And Method Of Execution Of The Order Is Specified In The Design Documentation Constituting An Annex To The Swz. If The Order Documents Include A Reference To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems, The Ordering Party Allows Solutions Equivalent To Those Described. February 6, 2026 An Application For A Permit To Carry Out Construction Works Within The Scope Specified In The Design Documentation Was Submitted To The Provincial Office For The Protection Of Monuments In Opole. Immediately After Receiving The Conservators Permission, The Ordering Party Will Submit An Application For A Building Permit. All Activities Related To Obtaining The Above Permits Are The Responsibility Of The Ordering Party.
|