|
The Subject Of The Order Is The Modernization Of The Sports Facility Of The School Complex No. 4 At Al. Bielska In Tychy. The Detailed Scope Of The Order Includes: 1) Demolition, Disassembly And Preparatory Works, 2) Renovation Of The Stands And Stairs To The Stands In Terms Of Filling In The Gaps, Leveling The Concrete Surfaces, Laying A Homogeneous Roll Carpet, Installing New Seats On The Stands And Installing Stainless Steel Balustrades, 3) Replacing The Internal And External Doors With New Aluminum Ones, 4) Adjusting The Windows In The Gymnasium In The Scope Of Maintenance/Replacement Of Window Stops, 5) Renovation Of The Gymnasium Parquet In The Scope Of Sanding, Varnishing And Reconstruction Of The Game Lines, 6) Painting Of Walls And Ceilings Of The Gymnasium, The Hall And Two Toilet Rooms, 7) Equipping The Gymnasium With Exercise Equipment, Including: Basketball Backboards, Handball Goals, A Jumping Board, Gymnastic Ladders, A Gymnastic Bar, Mattresses For The Wall Covering Behind The Goals, Polypropylene Mesh To Cover The Windows And Ceiling, 8) Replacement Of Lighting Fixtures In The Gymnasium With Led Fixtures, 9) Maintenance Of The Ventilation Installation In The Scope Of Cleaning/Ozonation And Replacement Of Ventilation Grilles, 10) Renovation Of Back-Up Rooms, Including: Painting Of Walls And Ceilings, Replacement Of Floor Tiles In Indicated Cloakroom Rooms, Replacement Of Shower Cabins And Replacement Of Shower Trays, Ventilation Maintenance Including Replacement Of Ventilation Grilles, 11) Renovation Of The Gym Room, Including: Replacing The Floor With A Homogeneous Roll Carpet, Replacing Radiator Casings, Painting The Room, 12) Renovation Of External Stairs, Including: Leveling The Surface With Leveling Compound, Applying Epoxy Resin, Cleaning The Steel Balustrade And Repainting With Anti-Corrosion Paints, 13) Insulating The Foundations Of The Gymnasium Building Including: Excavation, Preparation Of The Wall Base, Laying Two Layers Of Polymer-Bituminous Mass, Laying Extruded Polystyrene Thick. 10 Cm, Laying Of Dimpled Foil, Backfilling Of Trenches, 14) Drainage Around The Gymnasium Building, Including: Laying Of Drainage Pipes, Construction Of Prefabricated Manholes With A Manhole, Laying Of A Concrete Trough, Laying Of Geotextile, Laying Of Gravel Backfill, Connection To The Rainwater Drainage System, Making Of A Band Around The Building Of Concrete Cubes With Concrete Edges And Reconstruction Of Existing Paving Stones, 15) Cleaning Work Inside The Renovated Rooms And Outside After The Works, Including Humusing And Sowing Grass Seeds, 16) Surveying Support For The Task Of Drainage Around The Gymnasium Building. A Detailed Description Of The Subject Of The Order Is Attached As Annex No. 4 To The Swz. The Order Must Be Completed Within The Period: June 15, 2026 To August 28, 2026 (Works May Be Carried Out During The Summer Break, Taking Into Account The Commencement Of Works Two Weeks Before The End Of The School Year, As Agreed W
|