|
1. The Subject Of The Order Is The Performance Of Construction Works In The Building Of The Public Primary School In Zakrzew, Zakrzew 58D, 26-652 Zakrzew, Consisting In The Construction Of Mechanical Ventilation Installations, Freon Air Conditioning And The Reconstruction Of The Technological Heat Installation To Power The Heaters Of The Ventilation Units In The Building Of The Public Primary School In Zakrzew. 2. The Subject Of The Order Includes: 1) Comprehensive Works, Deliveries And All Other Activities And Works Related To The Installation Of Mechanical Ventilation, Freon Air Conditioning And Reconstruction Of The Technological Heat Installation To Power The Heaters Of Air Handling Units In The Building Of The Public Primary School In Zakrzew, Within The Scope And Limits Specified In The Design And Cost Estimate Documentation, Including In Particular: - Dismantling The Existing Ventilation Installation, Air Handling Unit And Technological Heat Installation, - Execution Of Technological Heating Installation; Installation C.T. Includes The Power Supply Circuit For Ventilation Units Located In The Utility Room On The Ground Floor Of The Building. An Individual Control Node Was Designed For Each Of The Units, Equipped With A Circulation Pump, A Three-Way Valve With An Actuator And Balancing And Cut-Off Valves, - Implementation Of A Mechanical Supply And Exhaust Ventilation System With Heat Recovery Based On Nw1, Nw2 Ventilation Units And Roof Fans W1 - W11 In Some Rooms Of The School, - Implementation Of An Air Conditioning Installation - Vrf System, In Some Rooms Of The School, - Implementation Of An Exhaust Installation Condensate, - Connecting The Electrical Power Supply To Ventilation And Air-Conditioning Devices, - Preparing A Design For The Workshop Installation Of Pipes Along With Providing Sliding And Fixed Supports And Submitting It To The Authors Supervision For Approval, - Purchase, Delivery, Assembly And Commissioning Of Air-Conditioning Devices And Mechanical Ventilation Installation Devices, - Preparing The Necessary Documentation And Registering The Devices Delivered Under The Agreement At The Office Of Technical Inspection, If Applicable, - Preparing The Necessary Documentation And Registering The Devices Delivered In As Part Of The Implementation Of The Agreement In The Cro System And Making Entries, If Applicable, - Other Minor Construction Works (Making Holes In Walls And Ceilings, Bricking Them Up, Filling, Painting Places After Installation, Etc.), 3. Due To The Need To Ensure The Continuity Of Operation Of The Kitchen And Dining Room In The School Facility, When Preparing The Schedule, The Contractor Is Obliged To Organize The Works In Such A Way That They Do Not Disturb The Operation Of These Rooms. All Works That Cannot Be Performed While The Kitchen Is Open, The Contractor Will Be Obliged To Perform During The Kitchen Shutdown Period, Which Will Take Place No Earlier Than June 1, 2026. 4. Warranty Conditions1) Minimum Wa
|