Tenders Are Invited For General Construction Work For Pipelines – Works Corresponding To Project 0925 To Imp ... in Spain
Tender Notice
TenderID
109590748
Tender Brief
Tenders Are Invited For General Construction Work For Pipelines – Works Corresponding To Project 0925 To Improve The Guardamar Del Segura Branch. Renovation Hms 45.1 To 58.0 (AcRojales)
General Construction Work For Pipelines – Works Corresponding To Project 09/25 To Improve The Guardamar Del Segura Branch. Renovation Hms 45.1 To 58.0 (Ac/Rojales). Within The Scope Of Action Of The Mct Is The Region Of Vega Baja Del Segura, In The South Of The Province Of Alicante, With The Upper Distribution Of A Large Part Of The Region Being Carried Out Through The Montesinos Network, Which Totally Or Partially Supplies The Municipalities Of Algorfa, Almoradí, Benijófar, Daya Nueva, Daya Vieja, Formentera Del Segura, Guardamar Del Segura, Los Montesinos, San Fulgencio, Rojales And Torrevieja, Through A Branched Network With Its Head In The Montesinos Tanks, Which Are Supplied From The Vistabella Delivery Center, Said Network Has About 60 Km Of Pipes With Diameters Between Dn250 And Dn1000, With Practically Half Of The Pipes Still Made Of Fiber Cement. It Is Structured In A Common Branch From Which 2 Branches Are Derived, Which Are Subsequently Divided Into 2 Other Branches: - Almoradí-Benijófar Branch: Almoradí Branch And Benijófar Branch. - Guardamar-Torrevieja Branch: Guardamar Branch And Torrevieja Branch. The Facility, Which Is About 40 Years Old, Has Numerous Extensions And Partial Renovations In Its Different Branches Carried Out Over The Years To Supply The Growing Demand, But Due To The Size Of The Facility It Still Retains Some Sections That Represent A Restriction For Operation With A Safety Margin, Especially In The Summer Periods. Especially Critical Is The Guardamar Branch, Since In Summer It Works At Its Maximum Capacity, Presenting 3 Main Limitations/Problems: - On The One Hand, There Are 2 Sections Of The Branch That Are Still Made Up Of 2 Fiber Cement Pipes In Parallel (Dn250 And Dn400) And Represent A Flow Restriction In Periods Of High Demand. - On The Other Hand, The Storage/Regulation Capacity In The Final Area Of The Branch Is Quite Limited, Since One Of The Intakes (La Escuera) Is Direct And In The 2 Guardamar Intakes (Rabosas And El Castillo) Its Reserve Capacity Is Scarce Compared To The Demand In The Summer Season. - The Final Section Of The Guardamar Branch, Which Feeds The El Castillo Tank, Is Made Of Dn250 Fiber Cement, Runs Through The Urban Area And Presents Frequent Breaks. This Project Includes The Renovation Of The Guardamar Branch Between Hms 45.1 And 58.
Contact Information
Contact No.
968320014
Email
contratacion@mct.es
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109590748
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.