Construction Work - Master Builders Work - Rit. Construction Work For The New Building On Marsstrasse And Klarastrasse Explanation: In The Neuhausen District Of Munich, Three New Residential Buildings With Underground Parking Are Being Built Between Marsstrasse 76 And Klarastrasse 11. The 3 Residential Buildings Will Be Built In Multi-Storey Construction And Are Each Connected To The Neighboring Block Edge Developments On Marsstrasse And Klarastrasse. The Shell Is Constructed Of Reinforced Concrete And Aerated Concrete Masonry. Apartment Partition Walls, Supports, Ceiling Panels And External Walls In The Areas In Contact With The Ground Are Made Of Reinforced Concrete; External Walls From The 1St Floor Onwards Are Built With Aerated Concrete Blocks. The Creation Of The Excavation Pit And The Bored Pile Foundation Is Carried Out By An Earthworks Company Before Construction Begins. The Excavation For The Floor Slabs And Foundations Must Be Carried Out By The Contractor. Preparatory Measures Construction Site Equipment 1 Psch. Crane, Boom At Least 45 M 2 Pcs. Container Protection Tunnel For Pedestrians 24 M Scaffolding Work 3,670 M2 Earthworks Excavation For Foundation Recesses/Construction Pit 1,760 M³ Deliver And Install Gravel In Some Areas 1,200 M³ Concrete Work Cleaning Layer C16/20, D=10 Cm 1,200 M2 In-Situ Concrete Foundations And Floor Slab, Ug/Tg 770 M³ In-Situ Concrete Walls Ug Up To 4Th Floor 1,090 M³ In-Situ Concrete Ceiling Above Ug Up To 4Th Floor 1,620 M³ Supports, Wall Pillars, Beams 174 M³ Balconies And Canopies As Prefabricated Parts 57 Pieces Of Staircase As Prefabricated Parts 36 Pieces. Reinforcing Steel Mesh B500a + Concrete Bars B500a 550 T External Thermal Insulation And Sealing Work Perimeter Insulation, Wlg 040, D=100 Mm 105 M2 Core Insulation, Wls 040, D= 50 - 120 Mm 1,120 M2 Bitumen Thick Coating 350 M2 Coating Os 5B 450 M2 Internal Insulation Walls And Ceilings Wood Wool Multi-Layer Insulation Board D=10 Cm 825 M2 Wood Wool Multi-Layer Insulation Board D = 6 Cm 55 M2 Masonry Work External Walls: Aerated Concrete Plank, 17.5 - 40 Cm 2,330 M2 Internal Walls: Sand-Lime Brick, 11.5 Cm 295 M2 Roller Shutter Boxes Roller Shutter Boxes 161 Pieces. The Start Of Execution Will Be Between June 8Th, 2026 And August 3Rd, 2026. The Exact Start Of Execution (Overall Start Of Execution) Will Be Communicated To The Contractor By The Client In Text Form, With At Least Twelve Working Days Between Receipt Of This Notification And The Announced Start Of Execution. The Contractor Must Inform The Client In Writing In Advance Of The Start Of Execution.
Contact Information
Address
Gustav-Heinemann- Ring 111
Contact No.
000
Email
SE02_05@muenchner-wohnen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109590579
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.