Construction Work – Repair Of Thuraustrasse And Factory Lines, Wil. In Wil, Thuraustrasse Leads From The “Rössli” Roundabout Eastwards To Under The Georg Rennerstrasse Bridge, Towards The City Gardening Center. In The Area From The Rössli Restaurant To The Kindergarten On Schönengrundweg, The Road And Sidewalks Are Being Renewed As Part Of A Repair Project. Edges, Shaft Covers And Asphalt Surfaces Will Be Completely Replaced Over A Length Of Around 290 Meters In The Western Section Of Thuraustrasse, From The Entrance To The Rössli Restaurant To The Marked Road Surface. In The Eastern Section, Around 120 Meters Of The Road Surface In The Area Of The Pipeline Construction Will Be Replaced. The Surface Layers In The Entire Area Will Be Renewed At A Later Date, Estimated In 2029 (Separate Tender). In The Section Of The Road Repair Described, The Wil Technical Company Is Creating Lines For A New District Heating Network, Which Will Also Be Continued From Schönengrundweg To The Schützenstrasse Intersection. The District Heating Network Consists Of A Main Line That Will Be Re-Laid In The Thuraustrasse Roadway At A Depth Of Around Two Meters Over A Length Of Around 400 Meters, As Well As Several Building Connections That Will Be Connected Crosswise To The New Main Line On Both Sides. At The Same Time, Water Supply Lines And Street Lighting Are Being Replaced Locally. Edges Bordering Private Properties Will Only Be Replaced Where The Condition Of The Existing Edges Requires This And The Landowners Agree To The Work Being Carried Out. The Temporary Narrowing Of Thuraustrasse Will Be Created By Narrowing The Side “Definitely” With A Green Area Without Tree Planting. In These Areas The Road Width Will Be Reduced To 3.50 Meters. The Existing Bus Stop Will Be Designed To Be Handicapped Accessible. For This Purpose, The Existing 16 Centimeter High Edge Edges Will Be Replaced By 22 Centimeter High Edge Edges, And The Height Of The Walkway Will Be Adjusted In These Areas. The Costs For The New District Heating Network, Water Pipes, Lines For Public Lighting, Including The Corresponding Replacement Of The Pavement, Will Be Borne By The Wil Technical Companies, While The Costs For The Road Renovation Will Be Borne By The City Of Wil. The List Of Services Contains Corresponding Object Structures. Two Work Contracts Are Created.
Contact Information
Address
Hauptstrasse 20
Contact No.
+41719144719
Email
sekretariatbuv@stadtwil.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109590014
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.