4.1. The Subject Of The Order Are Construction Works As Part Of The Investment Project Titled: Expansion Of The Selective Municipal Waste Collection Point In The Łopiennik Górny Commune.4.2. The Subject Of The Order Includes The Development Of The Area Of The Selective Municipal Waste Collection Point In Łopiennik Dolny Along With The Technical Infrastructure. To The Extent Consistent With The Developed Construction And Technical Designs, The Subject Of The Order Includes In Particular: 1) Construction Of A Foundation Slab And The Location Of A Container Building With A Social And Office Function, 2) Construction Of Concrete Boxes For Storing Bulk Waste Materials, 3) Construction Of A Warehouse Building For Waste Storage, 4) Construction Of A Warehouse Shelter For Waste Storage, 5) Construction Of Foundations And Installation Of A Sunken Truck Scale, 6) Demolition Of Existing Warehouse Buildings, 7) Construction Of Sidewalks, Roads And The Maneuvering Area, 8) Hardening Of Parking Spaces, 9) Construction Of An Internal Wlz Power Supply Line, Area Lighting And Video Monitoring, 10) Construction Of A Water Supply Connection With A Ground Hydrant, 11) Construction Of An External Sanitary Sewage System With A Connection To A Septic Tank, 12) Construction Of A Storm Sewage System With A Septic Tank, 13) Cutting Down Trees, 14) Equipping The Facility With Containers And Bins Adapted To The Collection Of Particular Groups Of Waste.4.3. A Detailed Description Of The Subject Of The Contract Is Included In Annex No. 1 To The Swz, Which Consists Of The Following Documents: 1) Design Documentation, (Note: The Design Documentation Included In Annex 1 To The Swz Contains A Wider Scope Of Construction Works Than Those Covered By The Subject Of The Contract In This Procedure - The Subject Of The Contract Does Not Include The Construction Of A Photovoltaic Installation Included In The Technical/Detailed Design Of Electrical Installations), 2) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), 3) Bills Of Quantities Works. Due To The Fact That The Contractors Remuneration Indicated In The Offer Will Be A Lump Sum, When Pricing The Offer, The Contractor Should Rely On The Scope Indicated In The Design Documentation And Stwiorb. The Bill Of Quantities Is Of An Auxiliary Nature. The Occurrence, During The Implementation Of The Contract, Of Works Not Included In The Bill Of Quantities Or Works In A Larger Quantity Than That Accepted In The Bill Of Quantities Will Not Entitle The Contractor To Demand Additional Remuneration - If These Works Were Included In The Design Documentation And Stwiorb. 4.4. The Subject Of The Order Includes The Execution Of Construction Works Together With Obtaining All Necessary Arrangements, Opinions, Decisions And Expert Opinions In Order To Obtain An Occupancy Permit.4.5. Apart From The Scope Of Construction Works Described In The Above-Mentioned Documentation, The Subject Of The Order Are Works An
Contact Information
Address
Gmina Łopiennik Górny,Łopiennik Górny,22-351,Lubelskie,Pl812 - Chełmsko-Zamojski
Email
urzad@lopiennikgorny.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109546482
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.