|
Tender For Material Handling Services-Iii For Gail Pdh-Pp Project Usar; 1 MATERIAL HANDLING SERVICES-III FOR GAIL PDH-PP PROJECT USAR 2 SHIPPING 3 Material Handling ChargesAll inclusive charges for taking delivery from Transport Companies Godown/ Railway Sidings of all types of consignments including loading onto vehicles, transportation to project site, unloading, stacking and shifting including all formalities with statutory authorities, verification of packages, weighments, surveys, open delivery, obtaining shortage/damage certificates, survey reports, GST enabled documents and supervision at all stages. (All types of transport vehicles, labour, cranes, lifting tackles, handling equipments / lashing materials etc. to be provided by contractor at every stage). 4 All inclusive charges for the collection and loading of small consignments received at various Transport Companies located in and around project location (indicated in technical section) within a radius as indicated below (km) or thereabouts from Project site, transportation to Project site (indicated in technical section),unloading and stacking.All types of general cargo, loose or packed including fabricated equipments, pumps, instruments, fittings, electrical items, cable drums etc. (Rate shall be quoted on per MT basis and payment shall be made asper actual weightof the consignment.) 5 General Cargo (Weight per Package) Upto 3 MTWithin Radius 150 kmFrom USARMAHARASTHTRA 6 General Cargo (Weight per Package) Above 3 MTUpto 9 MTWithin Radius 150 kmFrom USAR MAHARASHTRA 7 All inclusive charges for coordination with Transport Companies offices and completion of all documentation formalities like surrendering consignee copy of LR, submission of indemnity bond/undertaking letter, arranging freight payment etc. and follow up with the transporter for door-delivery of the consignment at project site. (Applicable for door delivery consignments only.) 8 Lumpsum service charges per GC Note (L.R. / G.R.) 9 All inclusive charges for unloading from vehicles arrived at Project site from outside directly and stacking as required.General cargoincludingContainer (Weight per Package) .This includes both indigenous and imported cargo arriving at Project site. 10 Upto 1 MT 11 Above 1 MTupto 5 MT 12 Above 5 MT upto 10 MT 13 Above 10 MT upto 15 MT 14 Above 15 MT upto 32 MT 15 Pipes ofvarious diameters andrandom lengths 16 Steel plates of varioussizes and thicknesses and random lengths 17 Structural steel items 18 Container destuffing at site 19 All inclusive charges for segregation of Structural Steel /Steel Plates / Pipes,Valves, size-wise at Project warehouse including, cranage, labour, breaking of stacks, shifting, restacking, marking with paint etc. 20 Steel Pipes 21 Unloading /Destuffing of bagged /drum items ( including chemicals and catalysts ) with forklift /suitable loading equipment with proper PPEs 22 Miscellaneous activities for Prevention and Preservation 23 Supply of Inert Gas Cylinder(Nitrogen):standard commercial nitorgen cylinders with Nitrogen at around 150Kg/cm2 (approx 2200 psig) pressure. 24 Inert Gas Cylinder (Nitrogen) recharging with Technician 25 Positive material identification (PMI) machine with operator (minimum one day per week) 26 Cleaning and application of rust preventive on bulk piping materials 2to 10 27 Cleaning and application of rust preventive on bulk piping materials 12and above 28 Greasing of valves upto 10 29 Greasing of valves 12 and above 30 All inclusive charges for shifting of consignments from one place to another within the project site including loading, transportation, unloading and stacking, labour, cranage etc. 31 By Truck Capacity 9 MT 32 By Trailer Capacity 20 MT 33 By pick up vehicle Capacity3 MT 34 All inclusive lumpsum charges for gas cutting of tack weldings on trucks/trailers with consignments to release the consignments from truck/trailer before unloading consignments.Rate includes cost of gas cutting equipments, consumables, operator, labour etc. (Charges payable only when the gas cutting equipment is maintained and gas cutting is carried out within the premises of warehouse storage yard.) 35 Rate Per Truck 36 Rate per Trailor 37 All inclusive charges for miscellaneous warehouse activities like opening of wooden cases / crates / bundles, segregation, removal to and from racks, cleaning of surfaces, applying rust preventive, cleaning of warehouse area, supply and covering of equipments / packed items in open storage yard with polyethene sheets, tarpaulin, marking with paint, taking measurements etc. as detailed inthe Item No. 3.0 of the Technical Section of Bid, including manpower, consumables, tools & tackles etc. (Rates shall be applicable as per person for eight hours of working and for the manhours beyond eight hours per day / Sunday / Holiday, prorata payment shall be made). 38 Miscellaneous Warehouse Activities 39 Grass cutting using Machine at open yards including operator, PPE, grass cutting machine, consumables & fuel (Working hour shall be from 0800Hrs to1800Hrs) 40 Painting and Stenciling including supply of paint, thinner, brush and labour and as per instruction of Engineer-In-Charge Upto 2 Inch 41 Painting and Stenciling including supply of paint, thinner, brush and labour and as per instruction of Engineer-In-Charge Above 2 Inch upto 4Inch 42 All-inclusive charges per month at site for supply of labour, equipments, tools & tackles required forday to day working and to be charged only when monthly billing of contractors total charges for Item group Nos. 01WW.50.1, 01WW.50.2, 01WW.50.3, 01WW.50.4,01WW.50.5,01WW.50.6 and 01WW.50.7, fall short of total of item group No : 01WW.50.9 (To be read in conjunction with Technical Section of the Bid clause no 13 of Preamble To Schedule Of Price ) Lumpsum Per Month charges for deployment of following Manpower / Equipments at project site (To be mobilized / demobilized on the discretion of Engineer-in-Charge) inline with the clause no 28of technical section of bid. 43 Unskilled workers 14 nos 44 Semiskilled workers 7 nos 45 Office Staff (computer literate with knowledge of SAP entry / system) 4 nos 46 Supervisor 1 nos 47 Skilled Worker 4 nos 48 Provision of crane as per clause no 8.0 of Technical Section of Bid Type of Crane Tyre mountedrevolving , Number of Crane 1 nos, Capacity 12 MT 49 LCV Truck with operatorand consumables No of LCV 1 Capacity 3 MT 50 Fork lift with operator and consumables , Type of Fork lift fork lift , Number of Fork lift 1 nos , Capacity 3 MT 51 Truck with Operator and Consumables No of Truck 1 Capacity 9 MT 52 Trailor with Operator and Consumables No of Trailor 1 Capacity 20 MT
|