|
1. The Subject Of The Order Is: Revitalization Of The Integration And Social Activity Center In The Lasowice Wielkie Commune - Revitalization Of The Social Activity Center In Tułach. The Scope Of The Order Includes: 1) Construction Works Including All Activities Related To Work Inside And Outside Buildings, Respectively, Including: Preparation Of The Construction Site, Demolition And Dismantling, Bricklaying And Plastering Works, Finishing Works, Among Others. Replacement Of Windows And Doors, Insulation Of Walls And Foundations, Including Plinth Cladding With Clinker Tiles, Ceiling, Flat Roof And Roof, Including Roofing, Flooring, As Well As Plastering, Window Sills, Suspended Ceiling, Canopies, Band Drainage, Painting, Sheet Metal Work, Gutters, Entrance Platform, Stairs, Moisture Insulation, Thermal Insulation, Lintels, Green Areas (Lawns, Planting Trees With Native Species), 2) Improving Accessibility For People With Disabilities, For Whom Full Access Will Be Provided From The Ground Level Through The Main Entrance To The Building And The Toilet, Which Will Be Equipped With Fixed Grab Bars At The Washbasin And Fixed And Movable Grab Bars At The Toilet, All Works Related To The Adaptation Of The Bathroom For People With Disabilities (Demolition, Disassembly, Bricklaying And Plastering Works, Cladding, Ceiling, Painting, Joinery, Window Sills, Handles, Information Signage),3) Sanitary Installations, Including: Installation Of Supply And Exhaust Ventilation, Mechanical Ventilation With Heat Recovery, Air Conditioning Installation, Installation Of A Recuperator, Air Conditioners, Installation Of Underfloor Heating Throughout The Building On New Floor Layers, Domestic Hot Water And Central Heating With An Air-Water Heat Pump With A Power Of 12.86 Kw With A Heat Buffer Tank And Domestic Hot Water Tank, Water And Sewage Installations. And Sanitary Facilities In Bathrooms, Water And Sewage Installations. And Necessary Kitchen Appliances, Including: Hood, Sink, Kitchen Sink, 4) Electrical Installations: Execution Of Electrical Installations, Including Lighting And Plug Sockets, 400V, Lightning Protection, Equalization And Photovoltaic Installations With A Total Power Of Approximately 6.5 Kwp.
|