1. The Subject Of The Order Is The Modernization Of The Boiler Room In The Building Of The School Complex In Zbiczno, At Ul. Szosa Brodnicka 77, 87-305 Zbiczno, Consisting In Replacing A Solid Fuel Boiler Fired With Eco-Pea Coal With A New Automatic Solid Fuel Boiler Fired With Pellets Along With Fuel Storage. One Solid-Fuel Boiler (A1) Was Designed With A Nominal Power Of 300 Kw. The Fuel For The Boiler Is Wood Pellets (Class: A1, A2, B). The Heating Medium Will Be Water With Parameters 80/60 ºc.2. The Scope Of Works Includes: 1) Disassembly Of The Boiler And Existing Pipelines (Which Will Be Replaced With New Ones) And The Existing Manifold, 2) Replacement Of The Existing Domestic Hot Water Tank. Including Accessories (Safety Valve, Expansion Vessel, Shut-Off Fittings And Anti-Contamination Valve Type Ea),3) Supplementing The Insulation On Existing Pipelines,4) Cleaning, Filling In Gaps, Repainting Walls And Ceilings In The Boiler Room And Fuel Storage Room,5) Making An Installation Hole In The External Wall For The Designed Boiler,6) Making Water Drains In The Boiler Room With Connections To The Existing Well Cooling In The Floor,7) Making Grooves In The Floor For The Sewage System And Laying A New Floor Finish (Ceramic Tiles),8) Dismantling The Existing Flue Gas Chimney And Renovation Of The Facade Of The Gable Wall, 9) Installing A New Chimney, 10) Renovation Of The Facade Of The Side Wall In The Boiler Room And Fuel Storage Area,11) Installing A Ventilation System,12) Installing The Electrical Installation, 13) Installing A Sanitary Sewage System In The Room Boiler Room, 14) Replacement / Installation Of 146 Pcs. Of Dn15 Thermostatic Valves (115 Pcs. To Be Replaced And 31 Pcs. Of Radiators Without Valves), 15) Preparation Of An Inventory Of The Construction And Central Heating Installations, A Project For The Modernization Of The Central Heating Installation. With Hydraulic Calculations And Thermostatic Valve Settings,16) Providing Complete Acceptance Documentation Including, Among Others, Approvals, Certificates, Technical Cards, Commissioning And Tightness Protocols, Guarantees Of The Devices Used, Operating Instructions Containing The Technological Diagram Of The Boiler Room, Basic Principles Of Operation Of The Installed Automation And The Method Of Its Programming And Operation, Checking Of Safety Valves,17) Reporting The Boiler Room Equipment For Acceptance By The Office Of Technical Inspection, Acceptance By The Office Of Technical Inspection And Bearing The Costs Of Acceptance Of The Office Of Technical Inspection (If Applicable),18) Training The Employee In The Operation, Operation And Maintenance Of All Installed Devices And Installations,19) Performing Inspections And Repairs During The Warranty And Warranty Period. In The Event Of A Failure, The Required Time For The Service To Reach The Facility During The Warranty Period Is 12 Hours. From The Moment Of Reporting.3. The Construction Project Will Be Implemented On The Basis Of N
|