4.1. Subject Of The Orderthe Subject Of The Order Are Construction Works Entitled: Construction Of A Sanitary Sewage Network And Expansion Of The Water Supply Network In Dobry Lasek, Piecki Commune. As Part Of The Implementation Of The Subject Of The Order, The Ordering Party Separated Two Elements: • Element 1 - Networks (Eligible Costs) - Co-Financed From The National Reconstruction And Resilience Plan, Covering The Construction Of A Sewage And Water Supply Network, • Element 2 - Connections (Non-Eligible Costs) - Financed From The Piecki Communes Own Funds.4.2. Scope Of The Order: The Subject Matter Of The Order Includes The Execution Of: A) In The Scope Of Element 1 - Network (Eligible Costs): - Gravity Sewage Network Using The Open Trench Method Made Of Pvc-U Sn8 Pipes Ø200 - 1286.50 M; - Gravity Sewerage Network Using The Directed Drilling Method (Without A Casing Pipe) Made Of Pe Pipes Ø200 - 63.0 M - Concrete Sewage Wells Ø1200mm – 52 Pcs.,- Plastic Sewage Chambers Ø425mm – 4 Pcs.,- Pressure Sewage Network Using The Open Trench Pe Method Ø90mm – 339M,- Pressure Sewage Network Using The Open Trench Method Pe Ø63mm – 513M,- Pressure Sewage Network Using The Open Trench Method Pe Ø50mm – 6M;- Network Pressure Sewage System By Drilling (Without A Protective Pipe) Pe Ø90mm - 295.80M, - Pressure Sewerage Network (In A Pe180 Protective Pipe) Pe Ø90mm - 47.20M, - Pressure Sewage Network (In A Pe140 Protective Pipe) Pe Ø90mm - 40.00M, - Main Pumping Station Ps1 - Polymer Concrete Dn1500 H=3200Mm - 1 Set, - Pp Expansion Chamber, Dia. 100Mm - 1 Piece, - Water Supply Network (Open Excavation Method) With Pehd Pipes, Dia. 90 Mm – 382 M Of Water Supply Network (In Pe180 Casing Pipe) Made Of Pehd Pipes, Dia. 90 Mm - 40 M Of Water Supply Network (Open Excavation Method) Made Of Pehd Pipes, Dia. 63Mm - 40M.B) Within The Scope Of Element 2 - Connections (Non-Eligible Costs): - Gravity Sewage Connections Made Of Sn8 Pvc Pipes Ø200 - 418.50 M; - Concrete Sewage Chambers Ø1200 Mm - 6 Pcs.; - Plastic Sewage Chambers Ø425 Mm - 24 Pcs., - Pressure Sewage Network Using The Excavation Method Open Pe Ø50mm – 2.5M, - Pp1 Home Pumping Station – 1 Set.4.3. The Detailed Scope Of Work Is Specified In The Documentation Below, Constituting Attachments To The Swz: 1) Design Documentation Prepared By The Company Projektowanie I Superzory Sanitech Przemysław Hatała From Iława, Consisting Of: • Land Development Project - Construction Of A Sanitary Sewage System And Expansion Of The Water Supply Network In Dobry Lasek, Piecki Commune, Plot No.: 30/1; 31; 32; 34/1; 36/3; 38/1; 40; 41; 44; 49; 59; 63/3; 65/4; 66/4; 66/6; 88/1; 90/2; 90/4; 118/20; 124/3; 125; 131/3; 131/5; 132/1; 132/2; 163; 165; 171/1; 171/5; 173; 174; 175/1; 175/2; 176; 177; 178; 179; 181/3; 3274/3; 3274/4; 3276/5;3276/18; 3276/19; 3276/21; 3276/22; 3276/24; 3276/25; 3276/26; 3276/27 District [0006], • Architectural And Construction Design - Construction Of A Sanitary Sewage System And Expansion Of The Water Su
Contact Information
Address
Gmina Piecki,Piecki,11-710,Warmińsko-Mazurskie,Pl622 - Olsztyński
Contact No.
897422029
Email
gmina@piecki.com.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109486516
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.