Railway Traffic Control Software Package – Renewal Of The Railway Power Network Control System. The Bls Operates A Traction Power Control System With Which The Entire Traction Power Network Is Monitored And Controlled Remotely. The Bls Traction Power Network Includes The 15 Kv/16.7 Hz Network For Supplying The Electric Locomotives In Rail Traffic And The 16 Kv/50 Hz Network For The Energy Supply In The Lötschberg Base Tunnel (Lbt). In Addition, The Bls Traction Power Control System Also Monitors And Controls Systems In The Sbb Traction Power Network. In The Traction Power Switchgear, Decentralized Controls Record The Measured Values, Switching States And Events And Transmit Them Via The Control Levels To The Central Network Control Center In Spiez. In The Opposite Direction, Control Commands Are Sent By The Operators To The Switchgear. The Network Control System In Spiez Is Therefore Considered A Central Instrument For The Operation Of The Bls And Sbb Traction Power Networks In The Aare Valley And Upper Valais. The Hardware Of The Network Control System Is Located In The Operations Center In Spiez And A Redundant System Is Located Separately In The Switching Station In Spiez. The Systems Are Monitored And Remotely Controlled Around The Clock By The Operators From Three Control Stations. The Current Power5 System From Siemens Was Purchased In 2012, Had Its Hardware And Software Replaced In 2019 And Will Reach The End Of Its Technical Useful Life In 2027.
Contact Information
Address
Freiburgstrasse 130
Contact No.
+41583274203
Email
valentin.striffeler@bls.ch
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109469737
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.