|
Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure, Siding/Fencing Height 1, 20M Facade Plastic Screen, Junior Civil Engineer With Additional Charges, Art Do Crea-Rs - Band 02, Master Of Construction With Additional Charges, 02/20/2026 - 18:21:10, 02/20/2026 - 18:21:11, Ballast With Granular Material, Applied On Floors Or Slabs On Ground, Thickness Of *5 Cm*, Mechanical Compaction Of Soil For Execution Of Radier, Concrete Floor Or Slab On Ground, With Vibrating Plate Type Soil Compactor, Execution Of Radier, Thickness Of 15 Cm, Fck = 30 Mpa, Using Forms In Sawn Wood, Assembly Of Loculo Gavetario In Pre-Molded Concrete Elements, According To Project, Mortar Mix 1:1:6 (In Volume Of Cement, Lime And Medium-Wet Sand) For Plastering/Single Mass/Laying Of Sealing Masonry, Manual Preparation, Masonry For Sealing Perforated Ceramic Blocks Nahorizontal Of 14X19x29 Cm (Thickness 14 Cm) And Laying Mortar Prepared In A Concrete Mixer, Masonry Of Structural Concrete Blocks 14X19x29 Cm (Thickness 14 Cm), Fbk = 14 Mpa, Using A Trowel, Frame Of Various Reinforced Concrete Structures, Except Beams, Pillars, Slabs And Foundations, Using 10.0Mm Ca-50 Steel - Assembly, Plaster Applied To Masonry (Without The Presence Of Gaps) Concrete Facade Structures, Using A Trowel. Mortar Ratio 1:3 Prepared In A 400L Concrete Mixer, Plaster Or Single Putty In Mortar Ratio 1:2:8, Mechanical Preparation With 400 L Concrete Mixer, Manually Applied On Blind Facade Panels (Without The Presence Of Gaps), 25 Mm Thickness, Plastering 5 Mm Walls With Lime/Cement Mortar And Sand 1:1:12, Manual Painting With Cement Cream - 3 Coats, Surface Waterproofing With Polymeric Mortar / Membrane Acrylic, 3 Coats, Manual Application Of Acrylic Sealer Base On External Walls Of Houses., Standard Acrylic Latex Paint, Manual Application On Walls, Two Coats, Slab Frame Of Conventional Reinforced Concrete Structure Using 4.2 Mm Ca-60 Steel - Assembly, Concreting Of Beams And Slabs, Fck=25 Mpa, For Any Type Of Slab With Buckets In Ground Floor Building - Launching, Densification And Finishing, Waterproofing Of Exposed Slab 3Mm Aluminum Asphalt Blanket, Pre-Molded Rectangular Piece, Concrete Volume Of 10 To 30Liters, Approximate Steel Rate Of 30Kg/M³., Installation Of Filter, Connection And Piping And Placement Of Activated Charcoal, In Drawer Module - Installation, Activated Carbon Filter, For A Set Of 40 Spacers, Pvc Tube, Normal Series, Building Sewer, Dn 40 Mm, Supplied And Installed In Discharge Branch Or Sanitary Sewer Branch. Af_08/2022, Te, Pvc, Dn 40 Af_08/2022, Manual Collection And Loading Of Rubble, 4M3 Bucket For Removing Rubble
|