The Subject Of The Order Is The Performance Of Construction Works For The Task Infrastructure In The Piastów Śląskich Housing Estate In The Scope Of Construction Of Ul. B. Wysokiego, Ul. M. Cylejska And Ul. Dukes Of Oleśnica. The Scope Of The Task Includes The Construction Of Municipal Roads, Parking Spaces, Sidewalks And Exits, Along With The Construction Of A Rainwater Drainage Network And A 0.4 Kv Power Grid For Road Lighting For The Streets: Bolesława Wysokiego, Małgorzaty Cylejskiej And Książat Oleśnicki. Scope Of Work/Works To Be Carried Out Under The Task: The Road Industry Includes, Among Others: − Preparatory And Demolition Works, Among Others. Dismantling The Surface Of Road Slabs (20 Cm Thick) Approx. 680 M2, Dismantling The Surface Of Concrete Cubes (Approx. 120 M2), Removing A Layer Of Fertile Soil (Topsoil), Adjusting Equipment. Post-Demolition Material With Delivery To The Area Indicated By The Ordering Party; − Construction Of Municipal Roads At Ul. Bolesława Wysokiego (Approx. 220 M, Width 7.0 M), Ul. Małgorzaty Cylejskiej (Approx. 277 M, Width 6.0 M) And Ul. Książąt Oleśnicki (Approx. 187 M, Width 6.0 M) With A Bituminous Surface Of A 4 Cm Wearing Course And An 8 Cm Binding Layer (With A Complete Structure On A Crushed Aggregate Base, With A Frost-Protective Layer Of Medium Sand, On A Cement-Stabilized Base, With A Curb On Both Sides), With Connections To Existing Roads And Land Development; − Construction Of Approx. Parking Spaces (Including Approx. 4 Spaces For People With Disabilities) With A Surface Made Of 8 Cm Gray Concrete Cubes With A Red Line Separating The Parking Spaces, Limited By A Curb, Fully Constructed On A Ballast Made Of Stone Dust, Substructure Made Of Crushed Aggregate, With A Frost-Protective Layer Of Medium Sand, On A Cement-Stabilized Base; − Construction Of Sidewalks (Approx. 1,118 M 2.0 M Wide; Approx. 25 M Wide, 3.0 M Wide And In The Area Of 7 Pedestrian Crossings, 4.0 M Wide Fragments) Made Of 8 Cm Gray Concrete Cubes And Elements Made Of Yellow Paving Slabs For The Blind (Approx. 44.8 M2), Limited By A Concrete Edge; − Construction Of Exits (Approx. 239.50 M2) With A Surface Of 8 Cm Red Concrete Cubes, With A Full Structure On A Ballast Made Of Stone Dust, A Base Of Crushed Aggregate, With A Frost-Protective Layer Of Medium Sand, On A Cement-Stabilized Base, Limited By A Curb, Roadside; − Topsoil And Grassing Of The Ground Areas Within The Road And Adjacent Areas (Approx. 0.2080 Ha); − Height Adjustment Of The Existing Infrastructure To The Terrain Elevations Of The Constructed Road; − Carrying Out Dedicated Research, Measurements, Tightness Tests, Tv Monitoring Of The Network, Etc.; − Implementing Target Vertical And Horizontal Markings (Including Lines Separating Traffic Lanes); The Sanitary Industry Includes, Among Others: Drainage To The Existing Collector Of The Rainwater Sewage System (Ul. Bolesława Wysokiego) And Through The Stormwater Sewage Network Under Construction (Ul. Małgorzaty Cylejskie
|