Access Road Construction Work – Pae Clabecq - Construction Of Infrastructure And An Underpass. The Contract Is A Civil Engineering Works Contract. The Work To Carry Out The Infrastructure And Equipment Works For The Future Business Park Consists In Particular And In A Non-Exhaustive Manner Of: Common: - The Installation, Maintenance, Modification And Dismantling Of Construction Site Signage; - Inventory; - The Implementation Of Safety And Health Measures Throughout The Construction Site; - Compliance With All Infrabel Impositions Regarding The Work To Be Carried Out In And Around Its Properties; - Clearing, Felling Of Trees And Grubbing; - Various Demolition Works (Coverings, Foundations, Localized Elements, Etc.) - Cet/Cta Disposal Of Waste From The Construction Site; - Cut And Fill Earthworks; - Compliance With The Monitoring Of The Approved Soil Expert Designated By The Contracting Authority Concerning The Quality Of The Earthworks And The Various Earth Movements; - Other Work Can Be Carried Out Simultaneously On The Site. This Mainly Concerns Work Carried Out By Infrabel On Its Property, Construction On Land Adjacent To The Site, Access To Duferco Wallonie Land, Etc. The Successful Bidder Adapts Its Organization Accordingly And Complies With The Directives Issued As Part Of The Coordination Of This Work. These Constraints Are An Integral Part Of The Companys Burden, Without It Being Able To Claim Any Compensation. Division 1: Vrd Infrastructure Following Qualiroutes Requirements: - Excavated Earthworks; - Provisional Storage Of Excavated Land; - The Possible Evacuation Of Excess Land And Its Treatment; - The Construction Of Reinforced Concrete And Gabion Retaining Structures; - The Creation Of Embankment With Added Materials (Stabilized Sand, Arable Land, Etc.); - The Creation Of Rainwater And Wastewater Drainage Networks; - The Construction Of Lifting Stations And Discharge Pipes - The Treatment Of Backfill Soil; - The Implementation Of Linear Elements; - The Construction Of Impetrant Trenches And The Coordination Of All Stakeholders; - Carrying Out Directional Drilling; - The Implementation Of The Sub-Foundations And Foundations Of The New Infrastructures; - The Implementation Of Coatings; - Plantations And Surroundings; - The Creation Of Road Markings; - The Supply And Installation Of Street Furniture; - The Installation Of Definitive Directional Signage; - Maintenance Work During The Warranty Period. Division 2: Underpass, Civil Engineering Works Following Qualiroutes Requirements: Construction Of A New Underpass Under Railway Tracks (Line 106) (Frame Bridge And Return Walls) In Reinforced Concrete And Its Installation By Pushing, Including: - Excavated Earthworks; - Provisional Storage Of Excavated Land; - Earthworks And Shielding Works; - The Supply And Installation Of Metal Sheet Piles;
Contact Information
Address
Rue de la Religion, 10
Contact No.
+32 67217111
Email
amarlot@inbw.be
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109362471
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.