|
Lot 1 - Rental Of Closed Modular Room 5.00 M Supply, Installation And Operation Of Air Conditioning (Air Conditioning), Disassembly And Removal, Ready For Use. The Module Must Have A Modular Structure With Closure In Rigid Panels, Finishing, Internal Height Compatible For The Presence Of People, 01 Door With Latch/Lock, Internal Lighting Installed And Sealing Compatible For Use In An External Environment, Guaranteeing Protection Against Weather. The Air Conditioning Must Remain Installed And Operational Throughout The Period Of Use, With Support/Maintenance For Immediate Restoration In The Event Of Failure. The Module Must Have Minimum Internal Electrical Points For Support Use (Sockets) And Safe Cable Passage, According To The Layout Of The Event. The Release Will Occur Through An Inspection And Inspection Checklist., Lot 1 - Temporary Pavilion/Shed, Shed-Type Structure With Two-Ground Roof, Modular, With Minimum Dimensions Of 20M (Width) X 50M (Length). -, Lot 1 - Supply And Installation Of Modular Plank Flooring By Hand, For Leveling And Circulation, With Ramps/Finishings And Ready For Use. The Floor Must Be Composed Of A Locked Modular Metal Structure And Marine Plywood Boards, With Edge Finishing, No Gaps And A Stable/Non-Slip Surface, With A Minimum Distributed Load Capacity Of 500 Kg/M. It Must Provide For The Execution Of Safe Transitions, With A Ramp And Finishing To Eliminate Steps And Abrupt Differences In Circulation Routes, As Per Supervision Guidance And Event Layout, Ensuring Continuous And Safe Circulation Of The Public And Equipment. Release Will Occur Through Inspection And Inspection Checklist, With Immediate Correction Of Non-Conformities., Lot 1 - Provision Of Supply, Installation, Repositioning When Necessary, Dismantling And Removal Of Containment Grid, Per Linear Meter, In A Ready-To-Use Regime, Intended For The Formation Of Queues, Isolation Of Technical Areas, Access Control And Sectorization Of The Event, In Accordance With The Guidelines - Provision Of Supply Services, Installation, Repositioning When Necessary, Dismantling And Removal Of The Containment Grid, Per Linear Meter, In A Ready-To-Use Regime, Intended For The Formation Of Queues, Isolation Of Technical Areas, Access Control And Sectorization Of The Event, In Accordance With Supervision Guidance And The Layout Defined By The Administration. The Railing Must Have A Minimum Height Of 1.10 M, A Metal Structure With Locks And Fittings, Stability And Alignment, Without Sharp Edges Or Elements That Pose A Risk To The Public, And Must Remain In Adequate Conditions Throughout The Period Of Use, With The Possibility Of Positioning Adjustments Upon Request From Supervisors. The Minimum Acceptance Will Be Given After Installation According To The Defined Sectorization And Inspection By The Supervisory Board, Lot 1 - Rental Of A Closed Modular Room Measuring 10.00 M X 10, With Minimum Dimensions Of 10.00 M X 10.01 Or More Doors Depending On Access Needs
|