Construction Work – 1559_2025Kor_Scaffolding Work. Modernization Immo 2 1. Ba The Scaffolding Work Advertised Is Primarily The Facade Scaffolding Required For Facade Renovation, Roof Renovation And Modernization Of The Rows Of Houses. The Tenders Are For Working And Protective Scaffolding W 09 And Lk 3 With Internal Consoles, Which Must Be Dismantled As Part Of The Construction Of The Thermal Insulation Composite System. The Scaffolding Is Temporarily Covered With Scaffolding Tarpaulins So That The Etics Can Be Applied. At The Upper End, The Scaffolding For The Roof Work (Carpenters, Roofers And Plumbers) Is Expanded Into A Roof Trap, Because Of The Steep Roofs As Fl 3 With Protective Wall Swd 2. Since The Balconies In Front Are Only Moved Outwards During The Construction Period (Railings And Infills Are Dismantled) And Remain Standing, They Must Be Integrated Into The Scaffolding Layers. This Requires Steps (Bridging Height Differences) And Additional Fall Protection In The Area Of The Balconies. After The Roof Work Has Been Completed, The Roof Trapping Must Be Dismantled For The Facade Work In The Area Of The Upper Balconies. The Scaffolding Is Erected One After The Other On The Rows Of Houses. Due To The Construction Processes, There Are Different Service Times. On The Rows Of Houses Where The Balconies Have Not Yet Been Moved At The Start Of The Scaffolding Work, The Facades Without Balconies Will First Be Scaffolded And These Facades Will Be Added After The Balcony Work. Staircases And Freight Elevators Are Provided On Both Sides Of All Rows Of Houses. A Pedestrian Tunnel Must Be Built Along Barbarossa Street. . Special Use Public Space 1 Psch Scaffolding Planning 1 Psch Proof Of Stability Scaffolding 1 Psch Facade Scaffolding, Work And Protective Scaffolding W09 Lk3 9340 M² Facade Scaffolding W09 Lk3 291530 M²where Protective Layer Under Scaffolding 660 M Terrain Adaptation 30-60 Cm, 60-100 Cm 600 M Protective Fence H 2.0 M Of Standing Scaffolding 660 M Scaffolding Cladding, Plastic Mesh Foil 9340 M² Pedestrian Tunnel 69 M Bridging At Entrances, Pedestrian Protection 63 M Bridging At Basement Exits 54 M Fall Protection Inner Railing 1390 M Deck Widening 30 Cm 4160 M Roof Guard Fl3 With Protective Wall Class C 690 M Special Constructions On Balcony Locations Stairs For Bridging Height Difference 110 Pieces Fall Protection Over Existing Balcony Locations, Tubular Construction 470 M Staircases H 11 M And H 14 M 12 Pieces Used Stairwells 390 Stwo Transport Platforms H 12 M And H 14 M 10 Pieces
Contact Information
Address
Gustav-Heinemann- Ring 111
Contact No.
000
Email
SE02_05@muenchner-wohnen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109317621
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.