Construction Work – Scaffolding Work - Rit. Scaffolding Construction Work For The Energy-Efficient Renovation And Maintenance Of Residential Buildings At Piusplatz 2-3, Aschheimer Str. 1-13, Grafinger Str. 44-50 And Aßlinger Str. 2-10 The Tendered Scaffolding Work Mainly Includes The Facade Scaffolding Required For The Facade And Roof Renovation As Well As For The Modernization Of The Rows Of Houses. It Should Be Noted That The Measure Takes Place When The Property Is Inhabited. Work And Protective Scaffolding Of Load Class 3, Width Class W09, With Consoles On The Inside Are Used. These Must Be Dismantled In Sections As Part Of The Installation Of The Thermal Insulation Composite System (Etics). For The Duration Of The Etics Work, The Scaffolding Will Be Temporarily Enclosed With Scaffolding Tarpaulins. At The Top, The Scaffolding For Carrying Out Roof Work (Carpentry, Roofing And Plumbing Work) Must Be Expanded To Form A Roof Trap. Structural Bridging And Conversions Are Required In The Area Of Balconies And Bay Windows. Stair Towers And Freight Elevators Must Be Provided On All Rows Of Houses On The Street And Courtyard Sides. A Pedestrian Tunnel Also Needs To Be Built On The Street Side. Along Aschheimer Straße And Grafinger Straße, This Must Be Made Wider Due To Bicycle Traffic. The Scaffolding Is Erected One After The Other On The Individual Rows Of Houses And Then Dismantled In Sections. Depending On The Construction Process, There Are Different Service Times. Rough Dimensions Scaffolding: Scaffolding Planning 1 Psch Proof Of Stability Scaffolding 1 Psch Facade Scaffolding, Working And Protective Scaffolding W09 Lk3 12702 M² Facade Scaffolding W09 Lk3 513123 M²where Conversion Of Bay Windows, Corner Bay Windows, Balconies, Corner Balconies In Total 8 Pieces Of Bridging System Lattice Girders 95 M Protective Layer Under Scaffolding 804 M Height Compensation Terrain Gradient 30-40Cm 844 M Protective Fence H 2.0M On The Stand Scaffolding 802 M Scaffolding Clothing, Plastic Mesh Foil 11015 M² Use Of Scaffolding Clothing, Plastic Mesh Foil 319426 M²wo Paving Widening 30 Cm 4673 M Pedestrian Tunnel B 2.50M 236 M For Use Of Pedestrian Tunnel B 2.50M 6844 Mwo For Use Of Pedestrian Tunnel B 1.50M 5365 Mwo For Use Of Bridges At Entrances, Pedestrian Protection 32 M Wall-Side Side Protection 1539 M Roof Trap With Protective Wall 794 M Of Single-Flight Staircases 263 M For Use Of Single-Flight Staircases 7627 Mwo For Scaffolding Elevator People/Material 9 Pieces Of Use Of The Scaffolding Lift People/Material 234 Hours Of Roofing Parapet 1251 M² Single-Level Scaffolding Foundation Cellar Staircase Exits 140 M Of Use Of Single-Level Scaffolding Foundation Cellar Staircase Exits 4060 M² Allowance For Etics Anchors 12097 M²
Contact Information
Address
Gustav-Heinemann- Ring 111
Contact No.
000
Email
SE02_05@muenchner-wohnen.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109314155
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.