1. The Subject Of The Project Is The Construction Of A Retention Reservoir (Pond) In The Town Of Zielin 2. Basic Scope: Construction Of A Retention Reservoir (Pond) With An Area Of 4,359 M2, Construction Of A Technological Road With Elements Of Small Architecture (4 Benches And 3 For Garbage), - Construction Of An Access Road With A Parking Bay, Planting Of Bushes And Trees Along The Roads3. The Investment Is To Be Carried Out In Accordance With The Design Documentation Attached To The Swz. 4. Additional Requirements For Built-In Elements: 1) Park Bench 4 Pcs. Technical Data: • Washed Stone, Chippings • Strips Made Of Coniferous Wood Dimensions Of The Bench: • Total Height: 88 Cm • Seat Height: 45 Cm • Length: 200 Cm • Width: 40 Cm • Board Thickness: 4 Cm • Weight: Approximately 150 Kg Color: • Black And White Grit. 2) Waste Bin 3 Pcs. Technical Data:• Capacity: 60 Liters• Emptying: By Removing The Insert• Ashtray: Present• Material: Washed Stone, Chippings, Wood Colors:• White And Black Chippings 1 Dimensions:• Total Height: 70 Cm• Length: 45 Cm• Width: 45 Cm• Weight: Approximately 130 Kg 5. For Shrubs Hedgerows, 60 Cm High Seedlings Of Undemanding Species Should Be Used, E.G. Common Privet, Barberry Or Other Species To Which The Ordering Party Agrees. For Planting Trees, Use Seedlings Of Deciduous Trees Of Min. Height. 2 M, Stem Forms In Pots Of Flowering Species, E.G. Hawthorn, Or Other Species To Which The Ordering Party Consents. The Type Of Planting Should Be Agreed With The Ordering Party Before Purchase. Each Tree Should Be Secured With Wooden Stakes At Least 1.5 M Above The Ground, 3 Pcs. 6. Additionally, Before Starting Construction Works, The Contractor Is Obliged To Place A Promotional Board With Dimensions: 120/60 Cm, On A Steel Frame, In The Place Indicated By The Ordering Party In Accordance With The Manual For Applicants And Beneficiaries Of European Funds For 2021-2027 In The Field Of Information And Promotion. The Table Template Is An Annex To Swz.7. The Ordering Party Obliges The Contractor To Obtain, On Behalf Of And On Behalf Of The Ordering Party, After Completing All Construction Works Covered By The Subject Of The Order, A Final Decision On The Permit To Use The Facility Or To Effectively Notify About The Completion Of Construction, In Accordance With The Applicable Provisions Of Construction Law.8. As Part Of The Above Obligation, The Contractor Is Obliged To Prepare And Complete Full As-Built Documentation, Submit The Required Applications Or Notifications To The Competent Construction Supervision Authority, Represent The Ordering Party During The Proceedings And Obtain A Final Decision On The Occupancy Permit Or No Objection From The Authority To The Notification Of Construction Completion. The Detailed Scope Of Work Is Set Out In The Design Documentation Prepared At The Request Of The Ordering Party, Constituting An Integral Part Of The Swz, Listed In Annex No. 9 To Swz.
Contact Information
Address
Gmina Trzebielino,Trzebielino,77-235,Pomorskie,Pl636 - Słupski
Email
skretariat@trzebielino.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 109309416
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.