Tender For E-Rate Quotation Of Non Dsr Items For Preparation Of Estimate For The Verious Works For Roads, Bu ... in India
Tender Notice
TenderID
108961863
Tender Brief
Tender For E-Rate Quotation Of Non Dsr Items For Preparation Of Estimate For The Verious Works For Roads, Buildings, Parking Arrangements And Other Alied Works Under Sinhastha 2026-27 At Nashik District
Tender for E-Rate Quotation Of Non Dsr Items For Preparation Of Estimate For The Verious Works For Roads, Buildings, Parking Arrangements And Other Alied Works Under Sinhastha 2026-27 At Nashik District , Water Logging Stoppage Concrete Pavement Block -Providing And Laying Water Sepage Concrete Is A Specialized Process That Differs From Conventional Concrete Factory Made Water Logging Stoppage Sustainable Pavement Blocks Of Required Strength, Thickness & Size/Shape, Typically Requires Digging 300 Mm To 450 Mm Deep Depending On Expected Loads. 60-100 Mm Thickness Base Layer: Install 150 Mm To 300 Mm Of Open-Graded Crushed Stone (20 Mm To 40 Mm Size). This Acts As A Reservoir For Water. Bedding Layer: Add A 25 Mm To 50 Mm Layer Of Smaller Clean Aggregate (E.G., 5 Mm To 10 Mm Crushed Stone) To Create A Level Surface For The Tiles.Laying: Place Pervious Tiles Snugly Against Each Other. For Structural Stability, Use Edge Restraints Like Concrete Curbs Or Specialized Metal Edging To Prevent The Tiles From Shifting Horizontally. Alignment: Check Levels Frequently With A Straightedge. Unlike Regular Tiles, You Do Not Need A Slope For Drainage Since Water Goes Through The Surface.Stormwater Management: Acts As An On-Site Retention Basin, Reducing The Need For Costly Detention Ponds Or Large Storm Sewers. Environmental Impact: Filters Pollutants (Hydrocarbons, Heavy Metals) From Runoff And Helps Mitigate The Urban Heat Island (Uhi) Effect By Allowing The Ground To Breathe. Safety: Reduces Hydroplaning, Tire Spray, And Glare At Night By Eliminating Standing Water. Tree Health: Allows Water And Air To Reach Tree Root Systems In Paved Urban Environments As Per Manufacturer Specifications & Direction Of Engineer-In-Charge. , Movable Precast Toilet Pods-Precast Concrete Toilet Pods Are Pre-Manufactured, Self-Contained Toilet Or Bathroom Units Made From High-Grade Reinforced Cement Concrete (Rcc), Which Are Transported To The Construction Site For Rapid Installation. They Offer A D
Contact Information
Contact Person
Executive Engineer, P.W.Division, Nashik
Address
Executive Engineer Public Works Division Nashik Bhandkam Bhawan Trimbak Road Nashik Tal. Dist. Nashik Tel. No.- 0253-2583761-64 2575324
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108961863
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.