|
1. The Subject Of The Investment Is The Reconstruction Of The Municipal Road On Plots No. 57, 81, 63/9, 80/2 And Hardening Of The Area On Plots No. 61/1, 62/9 Along Ul. Powale In Strzelce Krajeńskie. As Part Of The Above Works, It Is Planned To Build A Sidewalk With A Surface Of Concrete Slabs And Stone Cubes In The Road Area Of Ul. Podwale And On Adjacent Plots, As Well As Construction Of Ordinary Exits To Adjacent Plots.2. The Scope Of The Works Planned To Be Performed Will Include In Particular: 1. Preparation Of The Site For Construction• Measurement Works,• Local Removal Of The Soil/Topsoil Layer,• Demolition Works (Demolition Of Existing Concrete And Stone Curbs And Edges, Dismantling Of Aggregate Driveway Surfaces, Dismantling Of Existing Sidewalks Made Of Concrete Paving Stones).2. Construction And Assembly Works, • Drainage Of The Road Body (Vertical Adjustment Of Sanitary Sewage Inspection Well Covers), • Subbases (Construction Of A Trough For Structural Layers And Reinforcement Of The Subgrade With Cement-Stabilized Aggregate, Substructure Of Crushed Aggregate Under Exits), • Surfaces (Surface Made Of Stone Cubes, Concrete Slabs And Concrete Cubes On A Sand-Cement Ballast), • Street Elements (Setting Concrete Edges And Concrete Curbs),• Finishing Works (Topsoil And Sowing Grass Seeds In Green Areas Directly Next To The Designed Sidewalk). Detailed Description Of The Subject Of The Order Includes: Design Documentation (Land Development Design, Technical - Executive Design), Technical Specifications For The Execution And Acceptance Of Works, Bill Of Quantities, Constituting An Annex To Swz, Decision Of The Lubuskie Voivodeship Conservator Of Monuments No. Zn-G.5152.3.2026 [Skr] Of January 22, 2026. Note: Due To The Fact That The Basis For Settling The Works With The Contractor Is A Lump Sum Remuneration, The Bills Of Quantities Are Not The Basis For The Preparation Of The Valuation By The Contractor And Are Only Of Auxiliary, Informative Nature. Documents Describing The Subject Of The Order Should Be Treated As Mutually Explanatory And Complementary, In The Sense That In The Event Of Any Ambiguities Or Ambiguity Of Performance, The Contractor Will Not Be Able To Limit The Scope Of His Obligation Or The Scope Of Due Diligence. The Ordering Party Requests A Bid Cost Estimate In The Offer Containing Fixed Parameters Of Labor, Indirect Costs, Profit. The Contractor Of The Works - In Accordance With The Decision Of The Lubuskie Voivodeship Conservator Of Monuments: • Will Ensure Archaeological Research During The Investment, After Obtaining The Permission Of The Provincial Conservator Of Monuments, • Will Notify The Provincial Conservator Of Monuments About The Start Date And Completion Of The Construction Works Indicated In The Permit, • Immediately Notify The Provincial Conservator Of Monuments About Threats Or New Circumstances Revealed During Construction Works On The Monument, • Take Other Actions To Prevent Damage Or Destruction Of Th
|