The Subject Of The Order Is The Reconstruction Of The Municipal Road No. 190501C Modzerowo - Józefowo, 890 M Long, From Km 2+821 To Km 3+711 In The Town Of Józefowo. The Scope Of Work Includes: 1) Strengthening The 5.0 M Wide Road On The 859 M Long Section From Km 2+821 To Km 3+680 By Laying Bituminous Layers (Profile Layer In The Amount 0.100 Kg/M2 With The Arrangement Of The Smp 80 Kn/M2 Geogrid On The Edges Of The Road And The Asphalt Concrete Wearing Surface, 4 Cm Thick) - 4339.0 M22) Milling Of The Bituminous Surface, Thick. 4Cm Per Section From Km 3+600 To 3+680 In Order To Lower The Surface During Development3) Milling The Edges Of The Road Surface, 1.0 M Wide, On 30% Of The Area Constituting Breakthroughs And Laying The Above-Mentioned Profile 100Kg/M2, I.E. 46.44T4) Bed For The Needs Of Road Elements, Exits, Sidewalks5) Reconstruction Of The Culvert Under The Road From Concrete Pipes To Pp With A Diameter Of 800 And Reconstruction Of A Well With A Diameter Of 1000 Mm And A Street Inlet At The Intersection6) Reconstruction Of The Intersection Consisting In Widening The Road To 5.5 M Along With Correction Of The Curve By Paving The Arched Surfaces With Stones To Improve Turning Maneuvers At The Intersection 7) 1.5M And 1.2M Wide Stone Sidewalk Along The Road From Km 2+821 To 3+6828) Pedestrian Crossings With Solar-Powered Lighting On A Boom 9) Bus Platform 18M Long, 1.5M Wide Made Of Stones 10) Individual Exits And Public Roads Made Of Cobblestones And Asphalt Concrete. 11) Hardening Of Roadsides Made Of Crushed Stone, 50 Cm Wide, Over An Area Of 621.5 M212) Reconstruction Of A 800 Mm Culvert At Km 3+00913) Regulation Of Slopes And The Bottom Of Ditches - Ditches Long 489 M14) Vertical Markings, Including Active D-6 At The Pedestrian Crossing At The Community Center, Active B-20 Before The Intersection Km 3+71115) Speed Bumps Before The Pedestrian Crossing U16c - 2 Sets (4 Cushion Thresholds) 16) Horizontal Markings 17) Cutting Down Trees And Stumps Colliding With The Sidewalks. The Task Is Carried Out On The Basis Of The Notification Of The Intention To Build Or Perform Other Construction Works. Note: During The Works, Special Attention Should Be Paid To The Utilities Placed In The Road Lane. The Ordering Party Informs That A Detailed Description Of The Subject Of The Contract, Including Technology And Scope Works Are Included In The Design Documentation (Including Annexes) - Annex No. 8 To The Swz And Designed Contractual Provisions - Annex No. 7 To The Swz.
Contact Information
Address
Gmina Włocławek,Włocławek,87-800,Kujawsko-Pomorskie,Pl619 - Włocławski
Email
urzad@g.wloclawek.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108941390
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.