Construction Project For A New Integrated Control Center In Ingolstadt Besenbinderstrasse 4 85139 Wettstetten The Award Unit Includes Wastewater, Drinking Water, Hot Water And Gas Systems In The Building With An Area Of 2500 M2. Waste Water Is Disposed Of Via Gravity Pipes, In The Basement Via A Lifting System; Wires Outside The Building Are Not Included. Drainage Pipes Are Made Of Pp, Including Common Sanitary Objects. The Stainless Steel Drinking Water Installation Includes Fittings, Concealed Elements, Fire Protection And Insulation. A Ve System Is Planned. Hot Water Is Prepared Decentrally Via Instantaneous Water Heaters. The Gas System Includes The Connection Line From The House Connection To The Gas Boiler.
Contact Information
Address
Residenzplatz 1, 85072, Eichstätt
Email
hochbau-vergabe@lra-ei.bayern.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 108923162
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.