|
Embankment Works – Embankment Improvements On The Left Bank Of The Upper Tisza. Planning, Construction (Construction, Development) Of Water Facilities: Construction And/Or Development Of Flood Protection Water Facilities; Construction And/Or Raising (Development) Of A First-Order And/Or Second-Order Flood Protection Embankment On A Length Of 13,577 M; Construction And/Or Development Of Flood Protection Structures; Construction And/Or Development Of The Embankment Crown Cover Installed On A Flood Protection Embankment With A Length Of 13,577 M. Planning And Construction Of Water Facilities: Planning, Construction And Development Of Flood Protection Water Facilities; Design, Construction, Development Of Flood Protection Structures, Construction And Development Of Embankment Crown Cover. 1.) Embankment Development On The Left Bank Of The Tisza In The Section Between 130+681 – 143+258 Tkm (Raising The Embankment To The New Mász, Building Improvements And Renovations, Renovation Of Water Standards) 1.1. Tisza Left Party. Embankment Between 130+681-143+258 Tkm (Total 13,577 M) - Extermination Works 58,500 M2 - Demolition Works: 1,744 M3 - Temporary Ancillary Facilities: 18,250 M - Filling Construction Earthwork: 690,000 M3 - Paving Construction: 55,200 M2 - Charging Accessories: 12,800M - Utility Replacements: 1 Pc 1.2. Reconstruction Of The Petőfi Sluice (Hydraulic Structure) - Temporary Ancillary Facilities: 1 Pc - Construction Works 1 Pc - Construction Of Steel Structures: 6 Pc - Electrical And Asset Protection Works: 1 Pc 1.3. Flood Protection Infrastructure Plans (Approach Roads): Renovation Of Existing Pavement, Construction Of Paved Road, A Total Of 1,662 M 2 At Three Locations) River Control Works (Szatmárcseke-Alsó, Szatmárcseke-Felső, Tarpa Iv.) 2.1. Tarpa Iv. Reconstruction Of Coastal Protection - Clearing Works: 4,000 M2 - Stone Works: 9,700 M2 2.2. Reconstruction Of Szatmárcsekes Lower Shore Protection - Clearing Works: 2,600 M2 - Stone Works: 3,660 M2 2.3. Reconstruction Of Szatmárcsekes Upper Coastal Protection - Extermination Works: 1,500 M2 - Stone Works: 2,900 M2 3.) Other Expert Services: Nature Conservation Specialist Supervision, Archaeological Specialist Supervision 4.) Area Preparation: Ammunition Disposal, Geodesy, Soil Work (For Archaeological Excavation) 5.) Implementation, Operation, Licensing Documentation - 1 Pc Tisza Bp. Embankment Development Between 130+681-143+258 Tkm – 1 Petőfi Lock Reconstruction - 1 Flood Protection Infrastructure Plans (Approach Roads) –- 1 Tarpa Iv. Reconstruction Of Shore Biting - 1 Pc Szatmárcseke Lower Shore Biting Reconstruction - 1 Piece Szatmárcseke Upper Biting Reconstruction - Creation Of A Recycling Plan - Examining Compliance With The Dnah Principle And Taking It Into Account Is The Contractors Task, And During Construction, The Contractor Checks And Validates The Implementation Of The Interventions To Be Implemented In Accordance With The Dnah Principle In Accordance With The Requirements Of The Relevant Kehop Plusz Call For Identification Number The Public Procurement Documents Iii. Volume 3.19. According To The Provisions Of The Dnah Principles For This Investment Are As Follows: - Nature-Based Solutions And Minimization Of Energy Demand (In Part) - Exploration And Consideration Of Ecological Needs - Use Of Native Species - Green Public Procurement (In Part) - Recycling
|