|
Construction Work For Water Projects – Construction Of Flood Peak Reduction Reservoirs Felsőegerszeg. Construction Of A Dombvidéki Reservoir On The Border Of The Felsőegerszeg Village, Above The Valley Closure Dam Planned For The 1+750 Km Section Of The Varga-Oroszlói Watercourse. The Design Of The Reservoir With A Constant Operating Water Level Enables Its Complex Usability (Flood Peak Reduction, Water Retention, Water Storage, Welfare Utilization, Agricultural Utilization). Its Storage Capacity At Flood Water Level Is 497,677.8 M3. The Planned Interventions: - Valley Closure Dam Construction: Construction Of An Earthen Dam From Local Material - Construction Of 1 Water Level Control And Draining Structure: Construction Of A Combined Function Flood Level Control Structure With A Reinforced Concrete Structure, Steel Blocking And Moving Equipment, With The Possibility Of Passive Closure, An Access Bridge And Other Additional Facilities - 1 Construction Of A Flood Retaining Structure And Related Flood Retaining Channel: The Structure Is Embedded In Concrete Between Reinforced Concrete Sealing Teeth It Is Made With A Layered Natural Stone Covering, The Fore And Aft Part Of The Art Object, As Well As On The Tidal Channel, A Bed Protection Made Of Reno Mattress And Gabion Basket Is Made - Reservoir Arrangement: Humus Removal, Earth Extraction, Arrangement Of Shorelines, Bed Arrangement - Other, Additional Works: Replacement Of Utilities, Relocation Of Dirt Road, Construction Of Embankments, Arrangement Of Maintenance Strip, Afforestation - Reservoir Operation Requires Hydrographic And Other Facilities: Placement Of Hydrographic Station, Profile Stones, Stones Marking Plot Boundaries, Barriers, Guidance And Prohibition Signs Planning And Licensing Tasks: • Archaeological Documentation (Depending On The Erd, Erd I. And/Or Erd Ii.) • Ammunition Disposal Impact Study, • Preparation Of An Emergency Plan, • Public Utility Replacement Plans (If Necessary), • Sampling And Qualification Plan (Mmt) • Technological Instruction (Tu), • Organizational Plan, • Occupational Safety, Fire Protection, Safety And Health Protection Plan, • The Flood Protection Measure Plan, • All Other Plans That The Engineer Instructs The Contractor To Prepare. • Recycling Plan • Examination Of The Compatibility Of The Planned Development Elements With Settlement Planning Plans, If Necessary, Modification Of Settlement Planning Plans. Examining Compliance With The Dnah Principle And Taking It Into Account Is The Responsibility Of The Contractor, And During The Implementation, The Contractor Checks And Validates The Implementation Of The Interventions To Be Implemented In Accordance With The Dnah Principle In Accordance With The Requirements Of The Relevant Invitation Number Kehop Plusz--1.2.21. The Dnsh Principles For This Investment Are As Follows: - Nature-Based Solutions And Minimization Of Energy Demand (In Part) - Exploration And Consideration Of Ecological Needs - Use Of Native Species - Green Public Procurement (In Part) - Preparation Of A Recycling Plan The Task Of The Winning Tenderer Is To - Also Prepare Implementation And Realization Plans - The 191/2009. (Ix. 15.) With Content In Accordance With The Government Decree And The Applicable Legislation. The Contractors Task Is To Prepare All Kinds Of Licensing Plans, Applications And Documentation That Are Necessary For The Construction And Establishment In Addition To The Existing Permits.
|