|
Lot 1 - Local Administration*, Lot 1 - Conventional Construction Location, Using Template Of Pointed Running Boards Every 1.50M - 2 Uses. Af_03/2024, Lot 1 - Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, Lot 1 - Construction Shed, In Resin Plywood Sheet, Including Sanitary Facilities And Furniture - Der-Mg Standard, Lot 1 - Sewer Connection To Construction Shed On Site, Excluding Septic Tank, 11/02/2026 - 16:30:16, Lot 1 - Construction Shed For Storage And Tooling Type-I, Internal Area 14, 52M2, Including Furniture (Small Work, Effective Up To 30 Men), Der-Mg Standard, Lot 1 - Temporary Water Connection For Site, Including Hydrometer And Easel For Water Measurement - Main Entrance, In Galvanized Steel Dn 20Mm (1/2/) - Concessionaire Standard, Lot 1 - Temporary Connection With Air Energy Input, Cemig Standard, Installed Load From 15, 1Kva To 30Kva, Three-Phase, With Underground Output, Including Pole, Meter Box, Circuit Breaker, Bus Bar, Grounding And Accessories, Lot 1 - Mechanized Excavation For Crowning Block Or Footing With Backhoe Loader (Including Excavation For Placement Of Forms). Af_01/2024, Lot 1 - Mechanical Soil Compaction For Execution Of Radier, Concrete Floor Or Slab On Soil, With Percussion Soil Compactor. Af_09/2021, Lot 1 - Separating Layer For Radiar Execution, In Plastic Canvas. Af_09/2021, Lot 1 - Ballast With Granular Material (Crushed Stone N.2), Applied On Floors Or Slabs On Ground, Thickness Of *10 Cm*. Af_01/2024, Lot 1 - Manufacture, Assembly And Disassembly Of Formwork For Radier, In Sawn Wood, 4 Uses. Af_09/2021, Lot 1 - Slab Frame Of Conventional Reinforced Concrete Structure Using 6.3 Mm Ca-50 Steel - Assembly. Af_06/2022, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 10.0 Mm Ca-50 Steel - Assembly. Af_06/2022*, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 5 Ca-60 Steel, Lot 1 - Radier Concreting, Fck 30 Mpa - Laying, Densification And Finishing. Af_09/2021, Lot 1 - Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, Lot 1 - Surface Waterproofing With Polymeric Mortar / Acrylic Membrane, 3 Coats. Af_09/2023, Lot 1 - Polyester Veil For Waterproofing, Lot 1 - Assembly And Disassembly Of Rectangular Pillars And Similar Structures, Simple Straight Leg, In Resin Plywood Sheet, 8 Uses. Af_09/2020, Lot 1 - Assembly And Disassembly Of Beam Form, Without Propping, In Resined Wood Sheet, 8 Uses., Propping With Wooden Fork, 0 Mm - Assembly. Af_06/2022, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 6, Lot 1 - Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using Ca-50 Steel Of 8, Lot 1 - Unidirectional Pre-Molded Slab, Bi-Supported, For Floor, Ceramic Filling, Conventional Joist, Total Slab Height (Filling+Cover) = (8+4). Af_11/2020, Lot 1 - Concreting Of Pillars, Fck = 20 Mpa, Using Buckets - Laying, Densification And Finishing., Lot 1 - Concreting Of Beams And Slabs, Fck=20 Mpa, For Any Type Of Slab With Buckets In A Ground-Floor Building - Launch, Lot 1 - Sealing Masonry Of Perforated Ceramic Blocks Horizontally 9X19x19 Cm (Thickness 9 Cm) And Arg
|