|
Construction Work For Water Projects - Construction Of Gyöngyös Reservoir. Utilization Of The Gyöngyös Reservoir Complex And The Rehabilitation Of The Gyöngyös Flow Water System In The Framework Of The Investment, In Order To Utilize The Zalaszántói Reservoir (Hereinafter: Gyöngyös Reservoir) Complex, Built In The 1980S, The Existing Combined Flood Control Structure Will Be Rebuilt, The Embankment Will Be Raised, Silt Will Be Removed From The Currently Silted Reservoir Area In Consultation With The Nature Conservation Department, And The In The Reservoir, A Permanent Water Surface With A Depth Of Approx. 1-1.5 M. The Planned Interventions Are As Follows: • Construction Of A 101,000 M3 Reservoir • Drainage Structure (Technically, A Water-Permeable Structure, An Energy-Absorbing Structure): Renovation Of Stone And Concrete Structures, Installation Of A New Barrier Structure And Moving Equipment, Conversion Of An Operating Bridge • Restoration Of The Valley Barrier: Extraction Of Trees, Removal Of Roots By Demolishing The Embankment, Restoration Of The Embankment • Reservoir Area Dredging: Removal Of Sediment Deposited In The Reservoir Area, Arrangement Of The Forecourt Of The Building, Creation Of A Small Water Bed In The Reservoir Area •Establishment Of A Stabilized Working Road And Exit Ramp, Creation Of A Road Connection With A Barrier Closure •Construction Of Paved Belt Ditches To Protect The Planned Working Road And Ramp •Gyöngyös-Folyz And Ó-Berek Channel River Bed Arrangement In The Hills 10,000 M Lengthwise: Taking Ecological Aspects Into Account, Expansion Of The Reservoir Section, Maintaining And Transforming The Shape Of The Riverbed And The Alignment Of The Riverbed In A State Close To Natural, Adjusting The Height-Deficient Sections Of The Already Built Landfills, Arranging The Embankment Crowns, Afforesting The Parts Of The High Banks Above The Flood Level On The Left Bank, And Building A Riverbed Stabilizer. Demolition And Reconstruction Of Crossing Structures Is Also Necessary In Some Places. Reconstruction Of Two Bottom Steps In The Upper Section Of The Óberek Canal. Vegetation Thinning, Planting Vegetation Provides Shading. Establishment Of Premium Stone Insurance. Renovation Of Hydrographic Facilities. • Construction Of 1 Registering Water Meter. Part Of The Planned Interventions Will Be Implemented Within The Keszthely Mountains Nature Conservation Area (Natura 2000 Area). Planning And Licensing Tasks: • Pre-Inspections And Measurements Required For Planning, • Preparation Of Execution Plans, • Preparation Of Implementation Plans, Preparation And Approval Of Land Development Plans • Preparation Of Plans Related To Obtaining An Operating Permit, Approval Documentation, Preparation Of Operating Regulations, Management And Maintenance Manuals, • Preparation Of All Other Plans And Acquisition Of Permits Required By Law Or Authority To Start And Carry Out Work • Recycling Plan Preparation - Examination Of Compliance With The Dnah Principle And Taking It Into Account Is The Contractors Task, And During The Implementation, The Contractor Checks And Validates The Implementation Of The Interventions To Be Implemented In Accordance With The Dnah Principle In Accordance With The Requirements Of The Relevant Kehop Plusz-1.2.21 Call For Identification Number. Regarding This Investment
|