The Subject Of The Order Is The Reconstruction Of Ul. Przemysłowa With Sections Of Adjacent Streets In Rozdrażewo. The Main Elements Of The Works Planned To Be Performed: 1) Preparatory And Demolition Works - 0.37 Km, 2) Earthworks In The Municipal Road - 369 M3, 3) Curbs And Concrete Footing - 414 M: - Concrete Curbs With Dimensions Of 15X30 Cm, - Concrete Footing With Resistance Under B-15 Curbs, 4) Base: - Profiling And Mechanical Compaction Of The Base - 130 M2, - Concrete Base Without Expansion Joints, 12 Cm Thick - 130 M2, - Bottom Layer Of The Base 15 Cm Thick - 302 M2, - Upper Layer Of The Base 8 Cm Thick - 130 M2, - Ac16 Asphalt Binding Layer 3 Cm Thick - 130 M2.5) Surface: - Adjustment Of Water Supply Valves Along With The Purchase Of Boxes - 3 Pcs., - Vertical Adjustment Of Sewer Manholes - 3 Pcs., - Vertical Adjustment Of Telephone Wells - 8 Pcs., - Conversion Of A Above-Ground Hydrant Into An Underground One - 1 Pc., - Milling Of Asphalt Surfaces - 20 M2, - Sprinkling The Surface With Asphalt - 1,786.5 M2, - Ac16w Asphalt Binding Layer, 4 Cm Thick - 1,786.5 M2, - Ac11s Asphalt Wearing Course, 5 Cm Thick - 1,786.5 M2, 6) Pavement Construction: - Profiling And Mechanical Compaction Of The Substrate - 696.4 M2, - Concrete Edges With Dimensions Of 20X6 Cm - 360.2 M, - Drainage Layer 10 Cm Thick - 696.4 M2, - Sidewalks Made Of 60 Mm Thick Concrete Paving Stones - 696.4 M2,7) Entrances To The Property: - Profiling And Mechanical Compaction Of The Subsoil - 124.8 M2, - Concrete Edges With Dimensions Of 30X8 Cm - 92 M, - Upper Foundation Layer 8 Cm Thick - 124.8 M2, - Surfaces Made Of Concrete Paving Stones, 8 Cm Thick - 124.8 M2.8) Ditch Works: - Cleaning The Ditch From 20 Cm Thick Silt - 357 M, - Channels Made Of Pehd Pipes With An External Diameter Of 500 Mm - 48 M, - Strengthening The Slopes At The Channel Outlets With Stone Paving - 2.4 M3,9) Drainage Inlets And Sewers: - Cavernous Excavations - 48.3 M3, - Profiling And Mechanical Compaction - 32.2 M2, - Concrete Foundation Without Expansion Joints, 12 Cm Thick - 32.2 M2, - Lower Layer Of The Foundation, 15 Cm Thick - 32.2 M2, - Upper Layer Of The Foundation, 8 Cm Thick - 32.2 M2, - Ac16w Asphalt Binding Layer, 4 Cm Thick - 32.2 M2, - Concrete Street Sewage Wells With A Diameter Of 500 Mm - 7 Pcs., - Channels Made Of Pvc Pipes With An External Diameter Of 200 Mm - 42 M, - Strengthening The Slopes At The Channel Outlets With Stone Paving - 3.47 M3, 10) Marking: - Dismantling The Posts To The Signs - 5 Pcs., - Removing The Signs - 5 Pcs., - Attaching The D-6 Signs - 6 Pcs., - Attaching Signs D1 + A7 + A11 - 5 Pcs., - Smooth, Thick-Layer Horizontal Marking - 24 M2, 11) Tp Collisions: - Protection With Cable Casing Pipes - 62 M, 12) Temporary Marking And As-Built Inventory
|