|
The Subject Of The Order Under The Above-Mentioned The Name Is The Performance Of Construction Works Within The Meaning Of Art. 7 Point 21 Of The Public Procurement Law Involving The Expansion Of District Road 4137S, Ul. Jagiełły And 4137S, Ul. Wawelska In Bieruń On The Section From The Intersection With Ul. Warszawska (Dk 44) To The Intersection With The Bieruń Junction Slip Road. The Works Involve The Expansion Of Roads, Including: Road Structure, Road Surface (6.5 M Wide, 0.520 Km Long), Pedestrian And Bicycle Path (3.0 M Wide, 0.520 Km Long), Pedestrian Road (2.1 M Wide, 0.465 Km Long), Drainage, Lighting. The Implementation Of The Task Will Facilitate The Passage Of Vehicles Between The Dk44 National Road And The Bieruń Junction To The S1 Expressway Under Construction. The Works Within The Scope Of The Task In Question Will Consist In Particular In The Implementation Of: - Demolition And Earthworks, - Security And Regulation, - Drainage, - Service Channel, - Curbs And Edges, - Road, - Bus Bay And Platform, Bus Shelter, - Bicycle Paths, Pedestrian And Bicycle Paths And Pedestrian Roads, - Exits, - Vertical And Horizontal Markings, - Reconstruction Of The Conflicting Utility Network, - Reconstruction Of The Network. Power Engineering, - Construction Of Street Lighting. General Data Of The Roads Covered By The Order: • District Road No. 4137S, Ul. Jagiełły Bieruniu: - Road Class Z - Collective, - Average Road Width: 6.5 M.• District Road No. 4137S, Ul. Wawelska Bieruniu: - Road Class Z - Collective, - Average Road Width: 6.5 M. A Detailed Description Of The Subject Of The Order And Its Scope (Quantitative And Material) Are Included In The Following Documents: 1) Design Documentation - Annex No. 8 To Swz; 2) Bill Of Quantities Including, Among Others, Type Of Works Planned During The Implementation Of This Order And Their Exact Quantity - Annex No. 7 To The Swz; 3) Technical Specification For The Execution And Acceptance Of Construction Works (In The Part Containing Sets Of Requirements Regarding The Method Of Performing Construction Works, Including Requirements Regarding The Properties Of Materials, Requirements Regarding The Method Of Execution And Assessment Of The Correctness Of Execution Of Individual Works) - Annex No. 9 To The Swz. During The Execution Of The Order, The Contractor Will Provide Surveying Services For The Investment, And After Complete Completion Of The Works Covered By This Order, The Contractor Will Perform As-Built Geodetic Measurements (Post-Construction Geodetic Inventory - As-Built Documentation). Before Commencing Construction Works, The Ordering Party Recommends That The Contractor Perform An Inventory Of Geodetic Signs, E.G. Boundary Stones, At His Own Expense. In The Event Of A Conflict With The Investment, The Contractor Is Obliged, In Consultation With The District Surveyor And The Employer, To Remove The Conflict At His Own Expense. During Construction Works, The Road Will Be Marked For The Duration Of The Exp
|